During these two phases, the operations will be driven by the MOC. Especially, the MOC will have to perform critical S/C manoeuvres during the GAM, which may interfere with the RPW operation requests for SCM measurement.

Overall timeline

Give here the overall timeline of the operation, including the expected instrument operating configurations.

Orbitography

Give here the orbitography (i.e., time versus S/C orbit/attitude)

Operation Constraints

Give here the operation constraints at RPW and SOLO levels (e.g., TM rate, PW, SOOP, etc.)

Command/Control

...


Orbitography


Operation Constraints

The operation constraints are not yet known. However the MOC has indicated during the SOWG11 that they expect only 2 sequences of TC in order to control the payload during the E-GAM nav.:

  • A sequence to switch off properly the instrument
  • A sequence to switch on and enter in science mode

This scheme should allow instruments to make some sciences between each manoeuvre during which the payload shall be switched-off.

Command/Control


Data analysis

Expected data products

...