Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The name of the data package must be delivered as a zip file, named as: RPW_IGST4-2_DATAPACK_IssueXX_RevYY.zip, where XX and YY are the issue and revision of the data pack.

Main constraints

IGST RPW-related setup

The IGST will be run on the ETB with the RPW EM2.

In terms of command/control the RPW IDB (V4.3.3) is the same for EM1, EM2 and PFM, nevertheless the FDIR triggering threshold values can be different between the 3 models!

Moreover there is no SCM and PA-HF/ANT sensor on the ETB/RPW-EM2 setup, in consequence the during the IGST:

  • Switching ON SCM shall be prohibited
  • BIAS HV shall be not used
  • Switching ON PA HF shall be prohibited


Status of the data package 

...

QuestionAnswerSeverityComment
Do the sequences related to the routine operations (Bias sweeping, calibrations, etc.) will be tested during the IGST?
Low
How the



...