- The IGST 4_2 is planned to be run on the ETB with MEB EM2 on April 2018
- ISM doc. to be delivered at MOC before
- Procedure/sequence to be delivered at MOC before .
- MEB EM2 with IDB 4.3.3 will be used on ETB during test, however the procedures/sequences must be written using the PFM IDB 4.3.3 version (indicating clearly where there are discrepancies between the two versions).
- Presence of 1-2 max. people from RPW at ESOC during test is strongly recommended by MOC
...
In terms of command/control the RPW IDB (V4.3.3) is the same for EM1, EM2 and PFM, nevertheless the FDIR triggering threshold values can be different between the 3 models! This has to be taken account when validated the test results.
Moreover there is no SCM and PA-HF/ANT sensor on the ETB/RPW-EM2 setup, in consequence the during the IGST:
- Switching ON SCM shall be prohibited
- BIAS HV shall be not used
- Switching ON PA HF shall be prohibited
Info | ||
---|---|---|
| ||
According to Sylvain Lodiot (see comments at the bottom of the page) the corresponding prohibited TCs in the sequences must be clearly indicated with the [not for the EM2 on the ETB] comment. |
Status of the data package
...
ISM status
Version | Status | Comment |
---|---|---|
1.0 | Delivered | Delivered with the datapack 1.0 |
1.1 | In preparation (required updates due to changes in SQ between data pack 1.0 and 1.1) | To be delivered with datapack 1.1. |
...
Version | Status | Delivery date | Comment | ||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
1.0 | Delivered |
| Delivered to Sylvain Lodiot (MOC). See feedbacks in
| ||||||||
1.1 | To be delivered | Expected for | To be delivered to Sylvain Lodiot (MOC) |
...
Question | Answer | Severity | Comment | |
---|---|---|---|---|
Do the sequences related to the routine operations (Bias sweeping, calibrations, etc.) will be tested during the IGST? | Low | How the|||