Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Additionally to the sequences above, the following sequences shall not be run during the IGST, but are required to perform the E2E 0th test performed by the SOC (see RPW 0th E2E-0 TEST DATAPACK RELEASE for more details).

Sequence nameDescriptionCategoryStatusComment
AIWF033AInternal Calibration for LFRCalibrationDelivered
AIWF033BBIAS CalibrationCalibrationDelivered
AIWF033CRun THR internal calibrationCalibrationDelivered
AIWF033DConfigure and execute the BIAS sweepCalibrationDelivered
AIWF034ADump LFR, TDS, THR parametersDumpDelivered
AIWF036AConfiguration Bias currentsConfiguration Bias CurrentsDelivered

...

...