...
The point of contact from SWA-PAS team must be identified (might be SWA PI).
Operation preparation
Overall timeline
...
NEAR EARTH COMMISSIONING PHASE (NECP)
RPW-PAS filter tuning
...
of the mission
Details of this campaign
The purpose of this campaign is to define the configuration of the RPW filtering parameters to be applied during the whole mission.
...
- SY_LFR_PAS_FILTER_TBAD: perturbation duration
- SY_LFR_PAS_FILTER_MODULUS: modulus of the coarse time defining the perturbation instant
- SY_LFR_PAS_FILTER_OFFSET: offset added for computing the perturbation instant
- SY_LFR_PAS_FILTER_SHIFT: time-shift relatively to the timecode occurrence identifying the perturbation start
The operations linked to the RPW-PAS filtering tune campaign are not fully defined.
ROC
- Switch on SWA
- SWA-PAS max tension 6kV. This voltage is not verifiable in the lab à risk for BIAS
- Voltage sweep for SWA to verify the max voltage supportable by RPW.
- On flight, build up a table SWA V vs RPW V to be used during the mission.
- Validation SWA-PAS synchronization (critical for LFR) → COM or CP?? Considering a simultaneous switching of RPW and PAS during COM to test the synchro.
- S/C potential → Coordinated with SWA. Verify the possible range of values.
- Procedure to activate S20 and to require the TM. Coordinate with other instruments.
- SWA synchro
- Test of wheels filtering
...
Orbitography
Give here the orbitography (i.e., time versus S/C orbit/attitude)
...