Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Xavier Bonnin – ROC manager (LESIA)
  • Milan Maksimovic – RPW PI (LESIA)
  • Olga Alexandrova – RPW/SCM operations scientist (LESIA) – WG leader
  • Diane Berard – RPW operations engineer (LESIA)
  • Matthieu kretzschmar – SCM config, data analysis (LPC2E)

Operation preparation

...

Description of the operation

Context and objectives

The measurement will have to be done when the S/C is close to the Earth. In the current Feb. 2020 launch scenario this will only occurs during the first week of commissioning and during the Earth GAM (EGAM) at the end of the CP.

...

Overall timeline


Orbitography

...


Operational constraints

The operation constraints are not yet known. However the MOC has indicated during the SOWG11 that they expect only 2 sequences of TC in order to control the payload during the E-GAM nav.:

...

This scheme should allow instruments to make some sciences between each manoeuvre during which the payload shall be switched-off.


Command/Control


Operation description


Data analysis

Expected data products

...