Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

About the RPW calibration campaigns perfomed on-ground by the CNES and LESIA AIT/AIV teams.

...

EM2 Blank Test Campaign - 2016/04/14 to 2016/09/03 (CNES, Toulouse)

PFM Thermal Calibration Campaign - 2016/11/14 to 2017/01/09 (LESIA, Meudon)

PFM Delta Calibration Campaign - 2017/05/29 to 2017/06/02 (CNES, Toulouse)