Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

About the preparation and analysis of the RPW/SCM noise measurements, to be performed during spacecraft Earth magnetic lobes crossing.

...

General

Purpose & Objectives

During the CP (TBC), Solar Orbiter will pass inside the Earth magnetic lobes, where the B field amplitude is very low. It is the occasion for RPW to measure the SCM sensitivity.

...

Give here the overall timeline of the operation, including the expected instrument operating configurations.

Orbitography

Give here the orbitography (i.e., time versus S/C orbit/attitude)

...

Give here the operation constraints at RPW and SOLO levels (e.g., TM rate, PW, SOOP, etc.)

Command/Control

Give here the list of flight procedures and IOR (PDOR?) required to execute this operation

...