Tasks related to the SVT-0 datapackage release for RPW.
Preparation of the E2E-0 test data package for RPW:
- Related procedure/sequence to be delivered at MOC before (SOC in copy).
- Draft of related STP IORs to be delivered at SOC before .
- Final related STP IORs to be delivered at SOC on April 2018.
- SOC will send test specification on March-April 2018.
- MEB PFM IDB 4.3.3 will be used during test.
- The 0th E2E test is planned to be run on April-May 2018 at SOC.
- Presence of people from RPW at ESAC is not required (TBC)
Details about the E2E-0 test plan and specification can be found on the SOC public page (see https://issues.cosmos.esa.int/solarorbiterwiki/display/SOSP/SOC+System+Test+Specifications)
Input data files sent by SOC are available here: https://rpw.lesia.obspm.fr/roc/data/private/devtest/soc/E2E-0/ (restricted access)
Main points of contact are:
- Sylvain Lodiot at MOC (for procedures/sequences)
- Chris Watson at SOC (for IOR)
- Andrew Walsh at SOC (for LTP exercice timeline and E2E-0 datapackage submission)
Main features of the data package
- Release of the set of flight procedures/sequences to run the IOR related to the LTP SOWG10 exercice timeline (see https://solarorbiter.esac.esa.int/soopkitchen/#/planning/SOWG10_LTP_Exercise)
- Release of the STP IORs as expected by SOC (see E2E-0 test plan).
Description of the data package
- Set of STP IORs for the E2E-0 CP test
- Associated procedures/sequences (already delivered in the IGST 4_2 datapack)
- README.rst with a description of the content
- CHANGELOG.rst, with a history of modifications
The data package must be released as a zip file, named as: RPW_0thE2E_DATAPACK_IssueXX_RevYY.zip, where XX and YY are the issue and revision of the data pack.
Additionally, the ROC shall deliver the set of STP IOR files, as specified in the E2E-0 test plan.
Status of the data package
Sequences status
The sequences required to run the E2E-0 test are delivered to the MOC via the IGST data package.
See RPW IGST 4_2 DATAPACK RELEASE for a complete list of the sequences status.
Deliverable status
It is planned to deliver the IOR XML files for two identified STP-cycles of the SOWG10 LTP exercice timeline.
Content | Status | Comment |
---|---|---|
Set of draft STP IORs for the 0th E2E test | Delivered to SOC on (Feedbacks in comments of this page, and several iterations before finalization : v1.5) | To be checked:
|
Set of final STP IORs for the 0th E2E test | Done on May 16, 2018 |
Related Documents
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
Expected documentation
Related-release testing & validation
- See https://issues.cosmos.esa.int/solarorbiterwiki/display/SOSP/Zeroth+End+to+End+Test+Report for SOC report
- See https://ged.obspm.fr/j_obspm/docbase/asset/view_asset?asset_id=A1164&timeID=1541516436231 for ROC internal report of the E2E-0 test.
Related-release open questions
N/A
Release-related JIRA issues
Main features for this release
- Release of a first set of basic flight procedures for RPW (i.e., switch-on/off, enter standby/service/science, equipment switch-on and configuration)
- Release of a first issue of the RPW Instrument State Model for the MOC
Jira | ||||||||
---|---|---|---|---|---|---|---|---|
|
|
|
|