Working Group Members
RPW sub-system and SWA-PAS teams will also contribute to define the RPW modes to be set during the PAS filtering tune campaign.
Contact at MOC
- Sylvain dot Lodiot at esa dot int
Deliverables
Related resources
Meeting note
Action items
Attached items
- PAS_filter_tuning.docx
- TDS configuration :
View file name RPW-7_TDS_inputs_PAS_filtering_V02.docx height 250
Information about the RPW - PAS filtering tune campaign during the NECP.
Purpose & Objectives
TBW
Working Group Members
TBW
Operation preparation
Overall timeline
Give here the overall timeline of the operation.
Orbitography
Give here the orbitography (i.e., time versus S/C orbit/attitude)
Operation Constraints
Give here the operation constraints at RPW and SOLO levels (e.g., TM rate, PW, etc.)
Command/Control
Give here the list of flight procedures and IOR (PDOR?) required to execute this operation
Data analysis
Expected data products
Give here the list of expected data products
Results
Give here the results of the data analysis (can be attached file, or link to references)
...