About the preparation and analysis of the RPW/SCM noise measurements, to be performed during spacecraft Earth magnetic lobes crossing.

General

Purpose & Objectives

During the CP (TBC), Solar Orbiter will pass inside the Earth magnetic lobes, where the B field amplitude is very low. It is the occasion for RPW to measure the SCM sensitivity.

The SCM Noise Measurement Working Group (SNMWG) is in charge to prepare the operation (timeline, RPW config and associated flight procedures, expected data volume and power, etc.) and participate to the data analysis.

...

Working Group Members

  • Xavier Bonnin – ROC manager (LESIA)
  • Milan Maksimovic – RPW PI (LESIA)
  • Olga Alexandrova – RPW/SCM operations scientist (LESIA) – WG leader
  • Diane Berard – RPW operations engineer (LESIA)
  • Matthieu kretzschmar – SCM config, data analysis (LPC2E)

Operation preparation

Overall timeline

Give here the overall timeline of the operation, including the expected instrument operating configurations.

Orbitography

Give here the orbitography (i.e., time versus S/C orbit/attitude)

Operation Constraints

Give here the operation constraints at RPW and SOLO levels (e.g., TM rate, PW, SOOP, etc.)

Command/Control

Give here the list of flight procedures and IOR (PDOR?) required to execute this operation

Data analysis

Expected data products

Give here the list of expected data products

Results

Give here the results of the data analysis (can be attached file, or link to references)

Meeting Notes

Action Items & JIRA Issues

...

Points of contact

  • Sylvain Lodiot – SOLO Operations manager – (MOC)
  • Eric Lorfevre – RPW system engineer (CNES)

Deliverables

Related resources

Meeting Notes

Action Items

Jira
serverjira-lesia.obspm.fr JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQuery"Epic Link" = ROCOPE-149
serverIdcb08a004-0694-3237-bcb1-3125e3ed9bc0

Attached Files

  • SCM_noise_31mai2018.pdf (slides presented by O.Alexandrova during RPW consortium meeting #21 at Dresden on June 2018)
  • TDS configuration : 
    View file
    nameRPW-5_TDS_inputs_SCM_Noise_V02.docx
    height250
  • LFR configuration : 
    View file
    nameRPW-5_LFR_inputs_V02.docx
    height250