Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

About the preparation and analysis of the RPW ANT calibration rolls campaign, to be performed during the CP.

...

Working Group Members

Points of contact

  • Sylvain Lodiot – SOLO Operations manager – (MOC)
  • Baptiste Cecconi – Goniopolarimetry expert (LESIA)
  • Mykhaylo Panchenko - AKR/Antenna simulation expert (SRI)

  • Eric Lorfevre – RPW system engineer (CNES)
  • Jean-Michel Travert – RPW command/control engineer (CNES)
  • Moustapha Dekkali - MEB manager (LESIA)


Deliverables

Related resources

Meeting Notes

...

Open action Items

Jira
serverjira-lesia.obspm.fr JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQuery"Epic Link" = ROCOPE-47 and status in ('Open', 'In Progress')
serverIdcb08a004-0694-3237-bcb1-3125e3ed9bc0

Attached

...

items

  • AKR visibility.pptx (slides prepared by Mykhaylo Panchenko and presented by Milan Maksimovic at Dresden during RPW consortium meeting #21 on June 2018)
  • TDS configuration : 
    View file
    nameRPW-4_TDS_inputs_ANT_calibration_rolls_V02.docx
    height250
  • LFR configuration :
    View file
    nameRPW-4_LFR_inputs_V02.docx
    height250