List of acronyms and definitions used inside the ROC project.

Acronyms

The SOC list of acronyms is available here.



AcronymTermDefinition
ADCAnalogue-to-Digital Converter
ADPAcceptance Data Package
AFTAbbreviated Functional Test
AIT Assembly Integration and Test
AIVAssembly Integration and Assembly
AKRAuroral Kilometric Radiation
AOCSAttitude and Orbit Control Subsystem
APIDApplication ID
ARAcceptance Review
ASICApplication Specific Integrated Circuit
ASMAveraged Spectral Matrix
BP1 / BP2Basic Parameters 1/2
BIABias unit
BIASBias
Unit
unit
CAN Controller Area Network
CANCCAN Controller
CCSDSConsultative Committee for Space Data Systems
CDFCommon Data Format
CDPPCentre de Données de Physiques des Plasmas
CDRCritical Design Review
CILCritical Items List
CIRDROC Concept and Implementation Requirements Document
CMOSComplementary Metal Oxide Semiconductor
CNESCentre National d'Etudes Spatiales
CoICo-Investigator
COMFlight Commissioning Procedure
CPPACentral Part Procurement Agency

CRC

Cyclic Redundancy Check
CSWCentral Software
CWFContinuous WaveForm
DACDigital-to-Analogue Converter
DASDPU Application Software
DCLDeclared Component List
DDSData Dissemination System
DHSData Handling System
DMData Memory / Demonstration Model / Data Model
DMSData Management System
DPADestructive Physical Analysis
DPDDData Product Description Document
DPSData Processing Subsystem
DPUData Processing Unit
DRBDelivery Review Board
ECSSEuropean Cooperation for Space Standardization
EDACError Detection And Correction
EDDSEGOS Data Dissemination System
EEEElectronic Electrical Electromechanical

E-FECS

Enhanced Flight Event Communication Skeleton
EGOSESA Ground Operation System
EGSEElectric Ground Support Equipment
EID-AExperiment Interface Document part A
EID-BExperiment Interface Document part B
EIDPEnd Item Data Package
EMEngineering Model
EMCElectroMagnetic Cleanliness/Compatibility
EPDEnergetic Particle detector
EPPL European Preferred Part List
EQM Electrical Qualification Model
ESAEuropean Space Agency
ESACEuropean Space Astronomy Centre
ESDElectroStatic Discharge
ESOCEuropean Space Operation Centre
ESTRACKESA Tracking Station Network
EUIExtreme Ultraviolet Imager

      

*         

*

* DPA         Destructive Physical Analysis

* FCT           Flight Control Team

* FDIR         

E2EEnd-To-End
FAUSTRPW Flight Operation Request Editor
FCTFlight Control Team
FCPFlight Control Procedure
FDIRFailure Detection Isolation and Recovery
* FDS          

FDSFlight Dynamics System
*

FIFO
      
 First In, First Out buffer
* FFT         Fast

FIGARORPW Flight Operation Procedure Editor
FFTFast Fourier Transform / Full Functional Test
*

FM
        Flight
Flight Model
*

FMECA
    Failure
Failure Mode Effects and Criticality Analysis
* FOP          

FOPFlight Operation Plan
*

FPGA
        Field
Field Programmable Gate Array
*

FPU
        Floating
Floating Point Unit
GFTS
* GFTS         
Generic File Transfer System
*

GPI/O
    General
General Purpose Input/Output
*

GSE
        Ground
Ground Support Equipment

* HF         High Frequency

* HK         HouseKeeping data

* H/W         Hardware

* ICD        Interface Control Document

* ID            IDentifier

* IDB        Instrument DataBase

* I/F           Interface

* IOR           Instrument Operation Request

* JTAG         Joint

HFHigh Frequency
HFRHight Frequency Receiver
HKHousekeeping data
H/WHardware
IATInternational Atomic Time
ICDInterface Control Document
IDBInstrument Database
IDIdentifier
I/FInterface
IGSTIntegrated Ground/Space Function Test
INCAInstrument Commanding Automaton
IORInstrument Operation Request
JTAGJoint Test Action Group (IEEE 1149.1) standard test access port
*

KIP
        Key
Key Inspection Points

* LAT         Lot Acceptance Test

* LF         Low Frequency

* LFR         Low Frequency Receiver

* LSB        Least Significant Bit

* LTP           Long Term Planning

* LVPS         Low Voltage Power Supply

* MAG         Magnetometer

* MCS           Monitoring and Control Subsystem

* MDOR         

KPKey Point
LATLot Acceptance Test
LLDPLow Latency Data Pipeline
LESIALaboratoire d'Etudes Spatiales et d'Instrumentation en Astrophysique
LFLow Frequency
LFMLow Frequence Mode
LFRLow Frequency Receiver
LLLow Latency
LLVMLow Latency Virtual Machine
LSBLeast Significant Bit
LTPLong Term Planning
LVPSLow Voltage Power Supply
MAGMagnetometer
MAMPMaximal AMPlitude
MCSMonitoring and Control Subsystem
MDBMission Database
MDORMemory Direct Operation Request
*

MEB
        Main
Main Electronic Box
*

MFLOPS
    Million
Million Floating point Operations Per Second
MIB
* MIB          
Mission Information Base
*

MIP
      
 Mandatory Inspection Points
*

MIPS
        Million
Million Instructions Per Second

* MTL           Mission TimeLine

* MTP          

MTLMission Timeline
MTPMedium Term Planning
* MOC        Mission

MOCMission Operation Centre
* MPS          

MPSMission Planning System
* MSB        Most

MSBMost Significant Bit
MUSICMCS User Interface
*

* NC        No Consistance

* OBC          

N/
A        Not Applicable
ANot Applicable
NCNo Consistance
OBC
On-Board Computer
* OBT          

OBTOn-Board Time
OGS
* OGS          
Operation Ground Segment
* OTS        Off

OPERAROC Operation Planning Interface
OTSOff-The-Shelf
* PAD        Part

PADPart Approved Document
* PAM        Product

PAMProduct Assurance Manager
* PAP      

PAP Product Assurance Plan
* PCB        Printed

PCBPrinted Circuit Board

* PDR        Preliminary Design Review

* PDU        Power

PDUPower Distribution Unit

* PI        Principal Investigator

* PM        Program Memory

* PPM      

PIPrincipal Investigator
PLNPlan
PMProgram Memory
PPM Part Procurement Manager
PDR
* PDR          
Preliminary Design Review
* PDOR         

PDORPayload Direct Operation Request
* POPPy        

POPPyPlugin-Oriented Pipeline for Python framework
PR
* PR           
Preliminary Review
* QA           

PSDPower Spectrum Data
QAQuality Assurance
* QCI        Quality

QCIQuality Conformance Inspection
*

Rad-
hard  
hard Radiation-harderned
*

Rad-
tolerant    Radiation
tolerantRadiation-tolerant

* RAM        Random Access Memory

* RFP           RPW Flight Procedure

* ROADS        

RAMRandom Access Memory
RCSRPW Calibration Software
RDPRPW Data Products
REGUROC Engineering Guidelines for External Users
RFPRPW Flight Procedure
RGTSROC Ground Test SGSE
RIVPRCS Interface Validation Pipeline
RLLPSee LLDP
RNCRéférentiel Normatif du CNES
ROADSROC Operations And Data System

* RNC           Référentiel Normatif du CNES

* ROC          

ROCRPW Operation Centre
* ROM        RPW Operating Mode /

RODPRPW Operations and Data Pipeline
ROMRead-Only Memory
* ROR          

RORRPW Operation Request
RPL
* RPL          
RPW Packet parsing Library

* RPW        Radio and Plasma Waves (experiment)

* RTC        Remote Terminal Controller

* RVT        Radiation Verification Test

* SAP           Science Activity Plan

* S/C        Spacecraft

* SCET          SpaceCraft Elapsed Time

* SCOS         

RPWRadio and Plasma Waves instrument
RSSROC Software System
RSSSROC Software System Specification
RSWFRegular Snapshot WaveForm
RTCRemote Terminal Controller
RVTRadiation Verification Test
SAPScience Activity Plan
SBMSelected Burst Mode
S/CSpacecraft
SCETSpacecraft Elapsed Time
SCOSSpacecraft Control and Operation System
* SDDS         

SDDSoftware Design Document
SDDSSolar Orbiter Data Dissemination System
* SDRAM        Synchronous

SDRAMSynchronous Dynamic Randomw Access Memory

* SID        Structure Identification

* SEE        Single Event Effects

* SEL      

SFTShort Functional Test
SIDStructure Identification
SISSISBM Interactive Selection Software Interface
SEESingle Event Effects
SEL Single Event Latch-up
* SGS          

SGSScience Ground Segment
SGSE
* SGSE         
Software Ground Support Equipment

* SOC        Science Operation Centre

* SOOP         

SMSpectral Matrix
SOARSolar Orbiter Archive
SOCScience Operation Centre
SOOPSolar Orbiter Observing Plan

* SPA         Software Product Assurance

* SPICE        Spectral

SOWGScience Operation Working Group
SASolar Array
SPASoftware Product Assurance
SPAPSoftware Product Assurance Plan
SPICESpectral Imaging of the Coronal Environment
* SPID         
/ Spacecraft Planets Instrument C-matrix pointing & Event kernels software
SPIDSource Packet ID
* SPS        Sample

SPSSample Per Second
* SRDB         

SRDBSpacecraft Reference DataBase
* STIX        Spectrometer

SRSSoftware Requirements Specification
STIXSpectrometer / Telescop for Imaging X-rays

STBSpécifications
* STB        Spécifications
Techniques des Besoins

* STM        Structural Thermal Model    

* STP          

STM

Structural Thermal Model   


STPShort Term Planning
* SSMM        Solid

SSMMSolid State Mass Memory

* S/W        Software

* SWA        Solar Wind Analyser

* TBC        To Be Confirmed

* TBD        To Be Defined

* TBW        To Be Written

* TC        TeleCommand

* TDS        Time Domain Sampler

* TID        Total Ionising Dose

* TM        Telemetry

* TMC           Telemetry Corridor

* TMR        Triple Module Redundancy

* TNR-HFR    Thermal Noise Receiver/High Frequency Receiver

* TRR        Test Readiness Review

* UART        Universal Asynchronous Receiver/Transmitter

* UTC           Coordinated Universal Time  

* VO            Virtual Observatory

* VSTP          Very Short Term Planning

* WBS        Work Breakdown Structure

* WCA        Worse Case Analysis   

SSSSoftware System Specification
SUMSoftware User Manual
S/WSoftware
SWA Solar Wind Analyser
SWFSnapshot WaveForm
SWTScience Working Team
TBCTo Be Confirmed
TBDTo Be Defined
TBWTo Be Written
TCTelecommand
TDSTime Domain Sampler
TDS CALBA

THRTNR-HFR
THR CALBARTHR CALiBration SoftwARe
TIDTotal Ionising Dose
TMTelemetry
TMCTelemetry Corridor
TMRTriple Module Redundancy
TNTechnical Note
TNRThermal Noise Receiver
TRACRPW TM Rate Calculator
TRRTest Readiness Review
TSWFTriggered Snapshot WaveForm
TTTerrestrial Time
UARTUniversal Asynchronous Receiver/Transmitter
UTCCoordinated Universal Time
VOVirtual Observatory
VSTPVery Short Term Planning
WBSWork Breakdown Structure
WCAWorse Case Analysis