Information about the RPW electrical antennas deployment operation during the LEOP.

General

Purpose & Objectives

Prepare the RPW electrical antennas (ANT) deployement (x3) RPW-related operations during the LEOP.

...

Working Group Members

RPW sub-system teams will also contribute to define the RPW modes to be set during the deployement.

Operation preparation

Context & assumptions

RPW will be switched-off during the LEOP, except during the Boom and ANT deployments operations.

Contact at MOC

  • Sylvain dot Lodiot at esa dot int

Related resources

Meeting Notes

Actions items

Attached items

...

  • available during these operations.

The ANT deployement will be performed one by one, starting with the PZ (ANT1), then PY (ANT2), finally MY (ANT3). The deployment of the ANT1 will start at T1=TBD, the deployment of the ANT2 at T2=TBD, and the deployement of the ANT3 at T3=TBD.

The details of the deployment is given in the RPW Antenna User Manual.

The ROC and CNES are in charge of preparing the sequence of TCs relative to the instrument modes, to be operated during the deployements. The sequence of TCs that will drive the deployements them-selves will be delivered by the RPW antenna team.

Overall timeline

At SOLO level

The following operations will be then performed at the platform level.

TBD

At RPW level

The overall timeline of the ANT deployement is not fully known. Here is a first draft of what it is required from the RPW team.

The table gives the timeline for the first ANT deployement, assuming that the RPW configs. will be the same for the 3 ANTs.

...

  • This config shall include 3 to 5 minutes of "Galaxy mode" for THR

...

  • Specific SBM1 mode (will it require to change Packet Store?)
  • procedure_ant_depl.docx
  • TDS configuration : 
    View file
    nameRPW-3_TDS_inputs_antennas_V03.docx
    height250
  • LFR configuration : 
    View file
    nameRPW-3_LFR_inputs_V02.docx
    height250

...

Orbitography

TBD

Operation Constraints

At SOLO level

TBD

At RPW level

TBD

Command/Control

Give here the list of flight procedures and PDOR (TBC) required to execute this operation

Parameters to monitor

Expected products

Reviews & reports

TBD

Data analysis

Expected data products

Give here the list of expected data products and their content.

Results

Give here the results of the data analysis (can be attached file, or link to references)

Meeting Notes

Actions Items & JIRA Issues

Attached Files

...