...
Page properties | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||
|
Summary
Preparation of the IGST 4_2 data package for RPW:
...
Additionally to the sequences above, the following sequences shall not be run during the IGST, but are required to perform the E2E 0th test performed by the SOC (see RPW 0th E2E-0 TEST DATAPACK RELEASE for more details).
Sequence name | Description | Category | Status | Comment |
---|---|---|---|---|
AIWF033A | Internal Calibration for LFR | Calibration | Delivered | |
AIWF033B | BIAS Calibration | Calibration | Delivered | |
AIWF033C | Run THR internal calibration | Calibration | Delivered | |
AIWF033D | Configure and execute the BIAS sweep | Calibration | Delivered | |
AIWF034A | Dump LFR, TDS, THR parameters | Dump | Delivered | |
AIWF036A | Configuration Bias currents | Configuration Bias Currents | Delivered |
...
Related-release JIRA issues
Jira | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
|
...