Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.



Page properties
labelRapport JIRA


Dateoct. 12, 2017
Demandes

Jira
serverjira-lesia.obspm.fr JIRA
jqlQueryproject =

'

ROCOPE

'

AND fixVersion

in ('RPW SVT0 Release')

= "RPW E2E-0 DATAPACK" OR affectedVersion = "RPW E2E-0 DATAPACK"
counttrue
serverIdcb08a004-0694-3237-bcb1-3125e3ed9bc0



Summary

Preparation of the 0th E2E-0 test data package for RPW:

  • Related procedure/sequence to be delivered at MOC before  (SOC in copy). 
  • Related Draft of related STP IORs to be delivered at SOC before .
  • Final related STP IORs to be delivered at SOC on April 2018.
  • SOC will send test specification on March-April 2018.
  • MEB PFM IDB 4.3.3 will be used during test.
  • The 0th E2E test is planned to be run on April-May 2018 at SOC.
  • Presence of people from RPW at ESAC is not required (TBC)

Details about the E2E-0 test plan and specification can be found on the SOC public page (see https://issues.cosmos.esa.int/solarorbiterwiki/display/SOSP/SOC+System+Test+Specifications)

Input data files sent by SOC are available here: https://rpw.lesia.obspm.fr/roc/data/private/devtest/soc/E2E-0/ (restricted access)

Main points of contact Interlocutors are:

  • Sylvain Lodiot at MOC (for procedures/sequences)
  • Chris Watson at SOC (for IOR)
  • Andrew Walsh at SOC (for LTP exercice timeline and E2E-0 datapackage submission)
  • Fernando Martin Porqueras at SOC (for test manager)

Main features of the

release

data package

  1. Release of the set of flight procedures/sequences to run the IOR related to the LTP SOWG10 exercice timeline (see https://solarorbiter.esac.esa.int/soopkitchen/#/planning/SOWG10_LTP_Exercise)
  2. Release of the STP IORs as expected by SOC during operations (see IORS ICDE2E-0 test plan).

Description of the data package

  • Set of STP IORs for the E2E-0 CP test
  • Associated procedures/sequences (already delivered in the IGST 4_2 datapack)
  • README.rst with a description of the content
  • CHANGELOG.rst, with a history of modifications

The data package must be released as a zip file, named as: RPW_0thE2E_DATAPACK_IssueXX_RevYY.zip, where XX and YY are the issue and revision of the data pack.

Additionally, the ROC shall deliver the set of STP IOR files, as specified in the E2E-0 test plan.TBW

Status of the data package 

Sequences status

Most of the The sequences required to run the 0th E2E-0 test are delivered to the MOC via the IGST data package.

See RPW IGST 4_2 DATAPACK RELEASE for a complete list of the sequences status.

IOR

Deliverable status

It is planned to deliver all of the STP IOR for the 

Expected documentation

the IOR XML files for two identified STP-cycles of the SOWG10 LTP exercice timeline.

ContentStatusComment
Set of draft STP IORs for the 0th E2E test

Delivered to SOC on  

(Feedbacks in comments of this page, and several iterations before finalization : v1.5)

To be checked:

  •  Do the IORs cover the LTP time range?
  •  Do the IORs are consistent with the LTP RPW modes?
  •  Do the IORs are in agreement with the TMC constraints?
  •  Do the IORs are valid according to the IDB (4.3.3 PFM)?
  •  Do the IORs are valid according to the IOR ICD?
  •  Do the SOC GFTS is up-and-running?
Set of final STP IORs for the 0th E2E testDone on May 16, 2018

Related Documents

View file
nameSTP_data_rate_E2E0th_v1.2.xlsx
height250
View file
nameIORs_E2E0th_v1.1.zip
height250
View file
nameIORs_E2E0th_v1.5.zip
height250

Expected documentation

TBWN/A

Release-related JIRA issues

Jira
serverjira-lesia.obspm.fr JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject = ' ROCOPE ' AND fixVersion in ('RPW 0th CP E2E DATAPACK') = "RPW E2E-0 DATAPACK" OR affectedVersion = "RPW E2E-0 DATAPACK"
serverIdcb08a004-0694-3237-bcb1-3125e3ed9bc0