1. | - LFR
- Optimization of the LFR FSW is still in progress
- A major bug has been found:
- ASM are badly averaged → 7 samples discarded over 8 (only 1 sample used over 8)
- Only impact F0 and F1
- CPU budget should be OK (no significant change)
- QAP support:
- TDS
- TDS should be OK to deliver a first FSW patch on time (i.e., end of June 2021)
- This first patch will fix PCDU interference and minor bugs
- No mitigation of the 50 kHz interference is planned (as long as the origin is not fully understood)
- Additional FSW patching might be required during nominal phase.
- THR
- Moustapha and Pierre-Luc are not able to attend this telecon. A poll has been sent by Xavier to schedule as soon as possible a dedicated meeting about THR FSW upgrade status.
- Antonio has presented some slides about the preliminary analysis of data from EM2 tests at LESIA (to understand the TNR delta time issue). See his slides attached at the bottom of the page (FSW_may2021.pdf).
- New test runs on EM2 may be needed. Xavier has informed that Diane will not be available on June.
- ROC
- TNR test run on EM2 at LESIA were performed and resulting data delivered to THR team
- Still need to write formal plan in preparation to in-flight patching operation
- MOC/SOC will have to be informed if current planning is changed (e.g., THR and/or TDS patching postponed)
| - Xavier/Diane to inform Simone Thjis about planning (add her in the loop for MEB EM2 runs) - Before next telecon
- Jan to see if IDB changes are really needed or can be avoided. - Before next telecon
- Charles Dixon to send to LFR and THR teams the minimal QAP needs to support the FSW patching activities - Before next telecon
- CNES to organize a QAP-related telecon with LFR and THR team before next meeting
- LFR and THR teams: to send to Charles Dixon (with copy to Desi Raulin) the needs for QAP support - Before next telecon
- THR team to think about who will update the documentation related to FSW patching
- ROC and THR teams to plan with the support of Simone Thjis the run of TNR on EM2 (for investigating timestamp anomaly)
- ROC (Xavier) sends a message to MOC/SOC to keep them informed about plan - Before next telecon
- ROC (Xavier/Diane) to write a first "RPW FSW patching plan" detailling the needs, actors and planning - Before next telecon
- Xavier to see if joint effort is possible about QAP support for LPP and LESIA
|