Summary
Preparation of the 0th E2E test data package for RPW:
- Related procedure/sequence to be delivered at MOC before (SOC in copy).
- Related STP IORs to be delivered at SOC before .
- SOC will send test specification on March-April 2018.
- MEB PFM IDB 4.3.3 will be used during test.
- The 0th E2E test is planned to be run on April-May 2018 at SOC.
- Presence of people from RPW at ESAC is not required (TBC)
Interlocutors are:
- Sylvain Lodiot at MOC
- Chris Watson at SOC
Main features of the release
- Release of the set of flight procedures/sequences to run the IOR related to the LTP SOWG10 exercice timeline (see https://solarorbiter.esac.esa.int/soopkitchen/#/planning/SOWG10_LTP_Exercise)
- Release of the STP IORs as expected by SOC during operations (see IORS ICD).
Description of the data package
TBW
Status of the data package
Sequences status
The sequences required to run the 0th E2E test are delivered to the MOC via the IGST data package.
See RPW IGST 4_2 DATAPACK RELEASE for a complete list of the sequences status.
IOR status
It is planned to deliver all of the STP IOR for the SOWG10 LTP exercice timeline.
Content | Status | Comment |
---|---|---|
Set of STP IORs for the SOWG10 LTP exercice planning | First draft to be delivered before end of March 2018. | To be checked:
|
Expected documentation
- SOC Issues Test Specification (delivered by SOC in March 2018)
Related-release testing & validation
TBW
Related-release open questions
TBW
Release-related JIRA issues