Summary
Preparation of the IGST 4_2 data package for RPW:
- The IGST 4_2 is planned to be run on the ETB with MEB EM2 on April 2018
- ISM doc. to be delivered at MOC before
- Procedure/sequence to be delivered at MOC before .
- MEB EM2 IDB 4.3.3 will be used during test.
- Presence of 1-2 max. people from RPW at ESOC during test is strongly recommended by MOC
Interlocutors are:
- Sylvain Lodiot at MOC
Main features of the release
- Preparation of the RPW flight procedures/sequences for:
- Switch-on,
- Ping,
- exercise the different modes and changes between them (test the state model in the ORCD),
- dump with S6 of one of the instrument memories,
- generate science if possible,
Text S22 (context saving) if applicable(Not applicable for RPW)- Switch-off.
- Preparation of the related RPW Instrument State Model (ISM) doc.
Description of the data package
- List of RPW flight sequences (SQ) Excel files (one file per sequence), named as the sequence convention in the FOP Plan (FOPP) doc. The SQ files must be gathered by procedure (one directory per proceduce named as the procedure convention defined in the FOPP). The procedure directories must be grouped by type "FCP", "CRP" or "COM" (one directory per type).
- The RPW ISM doc. in pdf format
- A README.rst text file providing information about the content of the package
- a CHANGELOG.rst providing the changes history.
The name of the data package must be delivered as a zip file, named as: RPW_IGST4-2_DATAPACK_IssueXX_RevYY.zip, where XX and YY are the issue and revision of the data pack.
Status of the data package
Sequences status
IGST mandatory sequences
The table gives the list of critical sequences required to perform the IGST test.
Sequence name | Description | Category | Status | Comment |
---|---|---|---|---|
AIWF001A | From SAFE mode switch OFF the RPW prime power interface (UNIT_A and UNIT_B ) via OBCP. | Switch-off | In preparation | |
AIWF002A | From SAFE mode switch OFF the RPW prime power interface (UNIT_A and UNIT_B ) via manual. | Switch-off | In preparation | |
AIWF002B | Switch OFF the RPW prime power interface (UNIT_A) via OBCP from the SAFE mode | Switch-off | In preparation | |
AIWF010A | Boot RPW DBS in prime power interface (UNIT_A) via OBCP | Switch-on | In preparation | |
AIWF011A | Boot RPW DBS in prime power interface (UNIT_A) via manual | Switch-on | In preparation | |
AIWF030A | Boot RPW DAS from EEPROM1 (default), EEPROM2, RAM | Transition mode | In preparation | |
AIWF031A | Enter SERVICE mode and switch on RPW equipment | Transition mode (nominal case) | In preparation | |
AIWF035A | Enter SERVICE mode | Transition mode | In preparation | |
AIWF035B | Enter in SCIENCE SURVEY_NORMAL submode | Transition mode | In preparation | |
AIWF035C | Enter in SCIENCE SURVEY_BURST submode | Transition mode | In preparation | |
AIWF035D | Enter in SCIENCE SURVEY_BACKUP submode | Transition mode | In preparation | |
AIWF035E | Enter in RPW STANDBY mode from any other mode (except OFF) | Transition mode | In preparation | |
AIWF035F | Enter in SBM_DETECTION mode | Transition mode | In preparation | |
AIWF035G | Go to SAFE mode (DBS) with TC_DPU_RESET command | Transition mode | In preparation | |
AIWF032A | Configure THR for the RPW SCIENCE SURVEY_NORMAL mode. | Configuration | In preparation | |
AIWF032B | Configure the Bias (mode, and relay) for the RPW SCIENCE mode. | Configuration | In preparation | |
AIWF032C | Configure THR for the RPW SCIENCE SURVEY_BURST mode. | Configuration | In preparation | |
AIWF032D | Configure DPU and DAS + configure HK period | Configuration | In preparation | |
AIWF032E | Load common parameters of TDS | Configuration | In preparation | |
AIWF032F | Configuration of TDS, LFR for SBM1 mode | Configuration | In preparation | |
AIWF032G | Configuration of TDS, LFR for SBM2 mode | Configuration | In preparation | |
AIWF032H | Configure TDS LFM parameters | Configuration | In preparation | |
AIWF032I | Load calibration parameters for THR | Configuration | In preparation | |
AIWF032J | Load common parameters of LFR | Configuration | In preparation | |
AIWF032K | Configure TDS for the RPW SCIENCE SURVEY_NORMAL mode. | Configuration | In preparation | |
AIWF032L | Configure LFR for the RPW SCIENCE SURVEY_NORMAL mode. | Configuration | In preparation | |
AIWF032M | Configure TDS for the RPW SCIENCE SURVEY_BURST mode | Configuration | In preparation | |
AIWF032N | Configure LFR for the RPW SCIENCE SURVEY_BURST mode. | Configuration | In preparation | |
AIWF032O | Configure the Bias sweeping | Configuration | In preparation | |
AIWF260A | Dump DPU memory (TC_DPU_DUMP_MEMORY - Service 6) | dump (S6) | In preparation | |
AIWF370A | Run a test connection (PUS, Service 17) with the TC_DPU_TEST_CONNECTION {ZIW00012} (i.e. "ping") | Ping | In preparation |
Extra sequences (required for the E2E 0th test)
Additionally to the sequences above, the following sequences are not critical for the IGST, but are required to perform the E2E 0th test performed by the SOC (see RPW 0th E2E TEST DATAPACK RELEASE for more details).
Sequence name | Description | Category | Status | Comment |
---|---|---|---|---|
AIWF033A | Internal Calibration for LFR | Calibration | In preparation | |
AIWF033B | BIAS Calibration | Calibration | In preparation | |
AIWF033C | Run THR internal calibration | Calibration | In preparation | |
AIWF033D | Execute the BIAS sweep | Calibration | In preparation | |
AIWF034A | Dump LFR, TDS, THR parameters | Dump | In preparation | |
AIWF036A | Configuration Bias1 current | Configuration Bias Current | In preparation | |
AIWF036B | Configuration Bias2 current | Configuration Bias Current | In preparation | |
AIWF036C | Configuration Bias3 current | Configuration Bias Current | In preparation |
ISM status
Version | Status | Comment |
---|---|---|
1.0 | Delivered | Delivered with the datapack 1.0 |
1.1 | In preparation (required updates due to changes in SQ between data pack 1.0 and 1.1) | To be delivered with datapack 1.1. |
Data package delivery status
Version | Status | Delivery date | Comment |
---|---|---|---|
1.0 | Delivered |
| |
1.1 | To be delivered | Expected for | To be delivered to Sylvain Lodiot (MOC) |
Expected documentation
Related-release testing & validation
Related-release open questions
Question | Answer | Comment |
---|---|---|
Do the sequences related to the routine operations (Bias sweeping, calibrations, etc.) will be tested during the IGST? | ||
Related-release JIRA issues