You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

About the preparation and analysis of the RPW/SCM noise measurements, to be performed during spacecraft Earth magnetic lobes crossing.


Introduction

Purpose & Objectives

During the CP (TBC), Solar Orbiter will pass inside the Earth magnetic lobes, where the B field amplitude is very low. It is the occasion for RPW to measure the SCM sensitivity.

The SCM Noise Measurement Workin Group (SNMWG) is in charge to prepare the operation (timeline, RPW config and associated flight procedures, expected data volume and power, etc.) and participate to the data analysis.

Working Group Members

  • Xavier Bonnin – Operation constraint, control/command
  • Milan Maksimovic – RPW PI
  • Olga Alexandrova – Orbitography, RPW/SCM config, data analysis
  • Matthieu kretzschmar – RPW config, data analysis

Operation preparation

Overall timeline

Give here the overall timeline of the operation.

Orbitography

Give here the orbitography (i.e., time versus S/C orbit/attitude)

Operation Constraints

Give here the operation constraints at RPW and SOLO levels (e.g., TM rate, PW, etc.)

Command/Control

Give here the list of flight procedures and IOR (PDOR?) required to execute this operation

Data analysis

Expected data products

Give here the list of expected data products

Results

Give here the results of the data analysis (can be attached file, or link to references)

  • No labels