You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

Information about the RPW - PAS filtering tune campaign during the NECP.


General

Purpose & Objectives

TBW

Working Group Members

TBW

Operation preparation

Overall timeline

Give here the overall timeline of the operation, including the expected instrument operating configurations.

Orbitography

Give here the orbitography (i.e., time versus S/C orbit/attitude)

Operation Constraints

Give here the operation constraints at RPW and SOLO levels (e.g., TM rate, PW, SOOP, etc.)

Command/Control

Give here the list of flight procedures and IOR (PDOR?) required to execute this operation

Data analysis

Expected data products

Give here the list of expected data products

Results

Give here the results of the data analysis (can be attached file, or link to references)

Meeting Notes

Actions Items & JIRA Issues

Attached Files


  • No labels