Guidelines to help users to prepare RPW operations (procedures, operation requests, etc.). The users should read the Instrument Operations-Related Constraints and the presentations of the (2016-09-09) Instrument Commanding Workshop in complement to these guidelines.
Guidelines for the instrument procedure writers
Relevant Documents
- SOL-ESC-TN-10034: Instrument Operations Definition Guideline (Issue 1, Rev. 0, )
- SOL-ESC-IF-10002_FOP-ICD: Solar Orbiter Instrument FOP Procedure Input ICD (Issue 2, Rev. 0, )
- 1D- SOL-ESC-HO-05011, i1r1 [Instrument Procedure Inputs]: Instrument Procedure Inputs presentation during the (2016-09-09) Instrument Commanding Workshop
Guidelines for the instrument operation request writers
Relevant Documents
- SOL-SGS-ICD-0003_IOR-ICD: Instrument Operations Request ICD (Issue 1, Rev. 0, )
- 1B- Instrument commanding workshop - IORs v0_2: IORs presentation during the (2016-09-09) Instrument Commanding Workshop
Guidelines for the users of the MEB GSE ROC instance
Rules from the LV team (in French)
Pour que ce soit bien clair, quelques contraintes à prendre en compte :
- l'équipe LV devra avoir accès à ses scripts de référence sur la base roc_meb_db
- L'équipe LV devra pouvoir charger de nouveau script à discrétion (sinon il va falloir switcher entre plusieurs base, ce serait trop compliqué)
- Les scripts de l'équipe LV ne devront jamais être modifiés par le ROC (sauf accord de l'équipe LV...)
- Il faudra une nomenclature claire des scripts importés par le ROC pour que l'équipe LV puisse s'y retrouver (nom des scripts, auteurs, version, description...).
- A partir du moment ou un script a été exécuté une fois il ne peux plus être écrasé / modifié