|
Preparation of the E2E-1 test data package for RPW:
Details about the E2E-1 test plan and specification can be found on the SOC public page (see https://issues.cosmos.esa.int/solarorbiterwiki/display/SOSP/SOC+System+Test+Specifications). The baseline for the test is the SOWG13 LTP planning exercise ( https://issues.cosmos.esa.int/solarorbiterwiki/display/SOSP/SOWG+13+LTP+planning%3A+Context+and+Preparations).
E2E-1 test input data files sent by SOC are available here:
Main points of contact are:
The data package must be released as a zip file, named as: RPW_E2E-1_DATAPACK_IssueXX_RevYY.zip, where XX and YY are the issue and revision of the data pack.
Additionally, the ROC shall deliver the set of STP IOR files, as specified in the E2E-1 test plan.
The sequences required to run the E2E-1 test are delivered to the MOC in the RPW SVT1 data package.
See RPW SVT1-A DATAPACK RELEASE for a complete list of the sequences status.
It is planned to deliver the IOR XML files for TBD identified STP-cycles of the SOWG13 LTP planning exercice.
Content | Status | Comment |
---|---|---|
Set of draft RPW STP IORs for the E2E-1 test | Delivered to SOC on TBD | To be checked before deliverying:
|
Set of final RPW STP IORs for the E2E-1 test | Done on TBD |
N/A