Preparation of the SVT1 datapackage release for RPW.
The SVT1 campaign is expected to occur between Feb. to May 2019 (TBC). It will be driven by MOC from ESOC site (Darmstadt, Germany). The RPW PFM model integrated on the S/C will be used for the test.
No specific equipment is requested to the instrument teams (IT) to perform the test. MOC will use its own infrastructure.
The ROC team will have to deliver the SVT1 datapackage, then support the MOC team in the preparation, execution and analysing of the test. Presence of ROC team at ESOC during test is TBD.
Test plan and report will be written by the MOC. ROC will participate to the possible anomaly investigations related to RPW. A ROC internal test report for SVT1 will have to be written and stored in the ROC document managenemtn system (https://ged.obspm.fr/j_obspm/docbase/topic/browse_classic?topicID=T80) at the end.
Interlocutors are:
Jean-Michel Travert :
Si toutes les Antennes sont correctement connectées au moment du test alors on peut jouer toutes les TC. Si une Antenne n'est pas connecté, il y a 2 consignes : - Ne pas démarrer l'antenne qui n'est pas connectée donc ne pas utiliser TC_DPU_SWITCH_ON_EQUIPMENT (CP_DPU_SWITCH_ON_EQ: RPW_ANTi_EID, …) - Ne pas mettre une valeur différente de 0 en consigne du BIAS donc ne pas utiliser TC_DPU_SET_BIASi et TC_DPU_SET_BIAS_SWEEP avec l'argument CP_BIA_SET_SWEEP_ENAB_Pi = ENABLED Avec i qui correspond à l'antenne qui n'est pas connectée. C'est les mêmes contraintes que celles qui sont appliquées par ADS dans les essais qu'ils font.