Goals

Date

at 10PM (via ZOOM)

Attendees



Agenda

  1. Review of action-items and open issues (by each team: TDS, LFR, THR, ROC, DAS)
  2. Planning
  3. Next meeting
  4. AOB

Discussion items

ItemNotesAction-Items
1.
  • LFR
    • Optimization of the LFR FSW is still in progress
    • A major bug has been found:
      • ASM are badly averaged → 7 samples discarded over 8 (only 1 sample used over 8)
      • Only impact F0 and F1
    • CPU budget should be OK (no significant change)
    • QAP support:
      • A meeting was organized on April 30 between LFR, THR and CNES teams.
      • QAP support from CNES should very limited
      • Need to see with William Recart (from HENSOLDT SPACE CONSULTING, ex-NEXEYA) for QAP support

      • May be interesting to join effort in terms of QAP support for LFR and THR FSW upgrade activities? To be discussed between LPP, LESIA and CNES
  • TDS
    • TDS should be OK to deliver a first FSW patch on time (i.e., end of June 2021)
    • This first patch will fix PCDU interference and minor bugs
    • No mitigation of the 50 kHz interference is planned (as long as the origin is not fully understood)
    • Additional FSW patching might be required during nominal phase.
  • THR
    • Moustapha and Pierre-Luc are not able to attend this telecon. A poll has been sent by Xavier to schedule as soon as possible a dedicated meeting about THR FSW upgrade status.
    • Antonio has presented some slides about the preliminary analysis of data from EM2 tests at LESIA (to understand the TNR delta time issue). See his slides attached at the bottom of the page (FSW_may2021.pdf).
    • New test runs on EM2 may be needed. Xavier has informed that Diane will not be available on June.
  • ROC
    • TNR test run on EM2 at LESIA were performed and resulting data delivered to THR team
    • Still need to write formal plan in preparation to in-flight patching operation
    • MOC/SOC will have to be informed if current planning is changed (e.g., THR and/or TDS patching postponed)
  • Xavier/Diane to inform Simone  Thjis about planning (add her in the loop for MEB EM2 runs) - Before next telecon
  • Jan to see if IDB changes are really needed or can be avoided. - Before next telecon
  • Charles Dixon to send to LFR and THR teams the minimal QAP needs to support the FSW patching activities - Before next telecon
  • CNES to organize a QAP-related telecon with LFR and THR team before next meeting
  • LFR and THR teams: to send to Charles Dixon (with copy to Desi Raulin) the needs for QAP support - Before next telecon
  • THR team to think about who will update the documentation related to FSW patching
  • ROC and THR teams to plan with the support of Simone Thjis the run of TNR on EM2 (for investigating timestamp anomaly)
  • ROC (Xavier) sends a message to MOC/SOC to keep them informed about plan - Before next telecon
  • ROC (Xavier/Diane) to write a first "RPW FSW patching plan" detailling the needs, actors and planning - Before next telecon
  • Xavier to see if joint effort is possible about QAP support for LPP and LESIA
2.
  • Deltas might be needed w.r.t. to the current planning (see planning in point 2. in (2021-03-17) RPW FSW Patching Telecon), especially:
    • Feasibility of delivering THR FSW patch on June 2021 needs to be confirmed with THR team
    • TDS should be on time to deliver a first patch on June 2021
  • LFR team to refine the date of delivery for its patch in 2022 - End of 2021
  • Xavier to organize with THR team a meeting about THR FSW upgrades
  • Xavier to see with THR team about current planning readiness status
3.
  • Next meeting planned on June 25 at 10AM (CEST)

4.



Attached items