Information about the RPW electrical antennas deployment operation during the LEOP.
General
Purpose & Objectives
Prepare the RPW electrical antennas (ANT) deployement (x3) RPW-related operations during the LEOP.
Working Group Members
RPW sub-system teams will also contribute to define the RPW modes to be set during the deployement.
Operation preparation
Context & assumptions
RPW will be switched-off during the LEOP, except during the Boom and ANT deployments operations.
The SSMM will be available during these operations.
The ANT deployement will be performed one by one, starting with the PZ (ANT1), then PY (ANT2), finally MY (ANT3). The deployment of the ANT1 will start at T1=TBD, the deployment of the ANT2 at T2=TBD, and the deployement of the ANT3 at T3=TBD.
The details of the deployment is given in the RPW Antenna User Manual.
The ROC and CNES are in charge of preparing the sequence of TCs relative to the instrument modes, to be operated during the deployements. The sequence of TCs that will drive the deployements them-selves will be delivered by the RPW antenna team.
Overall timeline
At SOLO level
The following operations will be then performed at the platform level.
TBD
At RPW level
The overall timeline of the ANT deployement is not fully known. Here is a first draft of what it is required from the RPW team.
The table gives the timeline for the first ANT deployement, assuming that the RPW configs. will be the same for the 3 ANTs.
Start Time | Duration | ANT state | RPW state | Comment |
---|---|---|---|---|
T1 - 10 minutes | 9 min | The ANT1 is stowed | RPW is switched on and set to the ANT pre-deployement specific config. |
|
T1 - 1 minutes | 9 min | The ANT1 is stowed | RPW is set to the ANT deployement specific config. |
|
T1 + | ||||
T1 + | ||||
Orbitography
TBD
Operation Constraints
At SOLO level
TBD
At RPW level
TBD
Command/Control
Give here the list of flight procedures and PDOR (TBC) required to execute this operation
Parameters to monitor
Expected products
Reviews & reports
TBD
Data analysis
Expected data products
Give here the list of expected data products and their content.
Results
Give here the results of the data analysis (can be attached file, or link to references)
Meeting Notes
Actions Items & JIRA Issues
Attached Files
SOL-ESC-ME-10016, i1,r1 [Management of MAG and RPW data gathering during IBoom and RPW-ANT]_signed.pdf – The SSMM will finally available during these operations.