You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 10 Next »

Working Group Members

RPW sub-system teams will also contribute to define the RPW modes to be set during the PAS filtering tune campaign.

Contact at MOC

  • Sylvain dot Lodiot at esa dot int

Deliverables


Attached Files


General

Purpose & Objectives

Spurious signals triggered by the SWA-PAS unit have been identified during EMC ground campaigns.

Working Group Members

Points of contact

  • Sylvain Lodiot (MOC)

The point of contact from SWA-PAS team must be identified (might be SWA PI).

Operation preparation

Overall timeline of the mission

 

 

Details of this campaign 

The purpose of this campaign is to define the configuration of the RPW filtering parameters to be applied during the whole mission.

 

The four parameters to be tuned are the following:

  • SY_LFR_PAS_FILTER_TBAD: perturbation duration
  • SY_LFR_PAS_FILTER_MODULUS: modulus of the coarse time defining the perturbation instant
  • SY_LFR_PAS_FILTER_OFFSET: offset added for computing the perturbation instant
  • SY_LFR_PAS_FILTER_SHIFT: time-shift relatively to the timecode occurrence identifying the perturbation start

 

The operations linked to the RPW-PAS filtering tune campaign are not fully defined.


ROC

  • Switch on SWA
    • SWA-PAS max tension 6kV. This voltage is not verifiable in the lab à risk for BIAS
    • Voltage sweep for SWA to verify the max voltage supportable by RPW.
    • On flight, build up a table SWA V vs RPW V to be used during the mission.
  • Validation SWA-PAS synchronization (critical for LFR) → COM or CP?? Considering a simultaneous switching of RPW and PAS during COM to test the synchro.
  • S/C potential → Coordinated with SWA. Verify the possible range of values.
  • Procedure to activate S20 and to require the TM. Coordinate with other instruments.
  • SWA synchro
  • Test of wheels filtering

Orbitography

Give here the orbitography (i.e., time versus S/C orbit/attitude)

Operation Constraints

Give here the operation constraints at RPW and SOLO levels (e.g., TM rate, PW, SOOP, etc.)

Command/Control

Give here the list of flight procedures and IOR (PDOR?) required to execute this operation

Data analysis

Expected data products

Give here the list of expected data products

Results

Give here the results of the data analysis (can be attached file, or link to references)

Related resources

Meeting Notes

Actions Items

Open issues

Attached Files

  • No labels