Context
Prior to IGST 4_2 tests run at MOC on May 15th, 2018, tests will be conduct at LESIA MEB EM1.
The purposes of these tests are:
- Define the needed time between two TC
- Verify the well functioning of each sequence sent to the MOC for IGST 4_2
- Run the whole timeline of IGST 4_2 test in order to detect issues and fix them before the real test.
Note that these pre-tests will be run on MEB EM1 although IGST tests will be run on MEB EM2.
Details of the tests
Results of the tests