Context

Prior to IGST 4_2 tests run at MOC on May 15th, 2018, tests will be conduct at LESIA MEB EM1.

The purposes of these tests are:

  1. Define the needed time between two TC
  2. Verify the well functioning of each sequence sent to the MOC for IGST 4_2
  3. Run the whole timeline of IGST 4_2 test in order to detect issues and fix them before the real test.

Note that these pre-tests will be run on MEB EM1 although IGST tests will be run on MEB EM2.


Details of the tests

Results of the tests