Goals

  • Identify needs, open issues and action-items for the next RPW Flight Software upgrades
  • Build a preliminary schedule

Date

at 10PM (via ZOOM)

Attendees



Agenda

  1. Requirements and scope
  2. Validation process
  3. Schedule
  4. AOB

Discussion items

ItemNotesAction-Items
1.
  • Requirements and scope (introduction)
    • See slide 3 in RPW_FSW_Upgrade_Support_20201130_V01.pdf attached below
  • MOC needs and recommendation
    • See slide 4 in RPW_FSW_Upgrade_Support_20201130_V01.pdf attached below
  • TDS FSW needs and resources
    • See td_software_plans.pdf attachec below
  • LFR FSW needs and resources
    • See LFR FSW upgrade_30 november 2020.pdf attached below
  • THR FSW needs and resources
    • See THR_FS_Upgrade_30112020.pdf attached below
  • Desi Raulin - Check if CNES can supply support for FSW quality
2.
  • See slide 5 in RPW_FSW_Upgrade_Support_20201130_V01.pdf attached below
  • ROC (Xavier and Diane) - Check if stimuli  can be injected in the EM2 with the E-GSE at LESIA
  • ROC (Xavier and Diane) - Check with Sylvian Lodiot and/or Julian Braun about verification/validation steps at MOC level (only MDOR/PDOR consistencies?)
3.
  • Two scenarios are envisaged:
    • A optimistic scenario (A), assuming a on-board FSW patching on June 30, 2021
    • A pessimistic scenario (B), assuming a on-board FSW patching on October 31, 2021
  • TDS team should be OK with both scenarios
  • LFR team says that the optimistic scenario (A) is too short to be ready
  • THR team says it might be OK for the two scenarios but only for three first priority FSW patches.
  • The GO/NOGO of each team w.r.t. to the scenarios A or B will have to be known by end of January 2021. The final content of the FSW datapack for each team will have to be also defined at this date.
  • Main expected achievements and milestones for the two scenarios are summarized in slides 7 and 8 of RPW_FSW_Upgrade_Support_20201130_V01.pdf

4.
  • A second meeting will be planned at the end of January 2021 to discuss about the FSW readiness