Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Guidelines to help users to prepare RPW operations (procedures, operation requests, etc.)

Operations constraints

System constraints

Solar Orbiter system constraints

  •  Add constraints at Solar Orbiter level (TMC, Power cons., E-FECS, SBM, etc.)

RPW system constraints

Table below lists the constraints to be taken accounted when operating RPW.

Constraint descriptionInvolved sub-system(s)Possible impact(s)Possible solution(s)SeverityIn SERVICE mode, Bias unit must not be switched on at firstBias unitIf Bias unit is switched on first, its power can diverge.Switch on at least one of the analyser (TDS, LFR or THR) before the BIASHigh

. The users should read the Instrument Operations-Related Constraints and the presentations of the (2016-09-09) Instrument Commanding Workshop in complement to these guidelines.


Guidelines for the instrument procedure writers

Relevant Documents

Guidelines for the instrument operation request writers

Relevant Documents

Guidelines for the users of the MEB GSE ROC instance

Rules from the LV team (in French)

Pour que ce soit bien clair, quelques contraintes à prendre en compte :

  • l'équipe LV devra avoir accès à ses scripts de référence sur la base roc_meb_db
  • L'équipe LV devra pouvoir charger de nouveau script à discrétion (sinon il va falloir switcher entre plusieurs base, ce serait trop compliqué)
  • Les scripts de l'équipe LV ne devront jamais être modifiés par le ROC (sauf accord de l'équipe LV...)
  • Il faudra une nomenclature claire des scripts importés par le ROC pour que l'équipe LV puisse s'y retrouver (nom des scripts, auteurs, version, description...).
  • A partir du moment ou un script a été exécuté une fois il ne peux plus être écrasé / modifié
Operations constraints