Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Andrew Walsh (SOC)
  • Philippe Plasson (RPW flight software manager)

Operation preparation

Overall timeline

Give here the overall timeline of the operation, including the expected RPW operating configurations.

Orbitography

Give here the orbitography (i.e., time versus S/C orbit/attitude)

Operation Constraints

Give here the operation constraints at RPW and SOLO levels (e.g., TM rate, PW, SOOP, etc.)

Command/Control

Give here the list of flight procedures and IOR/PDOR/MDOR required to execute this operation

Data analysis

Expected data products

Give here the list of expected data products

Results

Give here the results of the data analysis (can be attached file, or link to references)


Related ressources

Meeting notes

...