You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Current »

About the validation of the of the RPW SBM selective downlink implementation.


General

Purpose & Objectives

The life-cycle related to the RPW SBM1/SBM2 selective downlink shall be validated during the Cruise Phase.

Working Group Members

Point of contacts

  • Andrew Walsh (SOC)
  • Philippe Plasson (RPW flight software manager)

Operation preparation

Overall timeline

Give here the overall timeline of the operation, including the expected RPW operating configurations.

Orbitography

Give here the orbitography (i.e., time versus S/C orbit/attitude)

Operation Constraints

Give here the operation constraints at RPW and SOLO levels (e.g., TM rate, PW, SOOP, etc.)

Command/Control

Give here the list of flight procedures and IOR/PDOR/MDOR required to execute this operation

Data analysis

Expected data products

Give here the list of expected data products

Results

Give here the results of the data analysis (can be attached file, or link to references)

Related ressources

Meeting notes

Actions items

Open issues

#DescriptionSolution(s)StatusComment










Attached Files


  • No labels