You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Context

IGST 4_2 are tests run at MOC (ESA Darmstadt) on May 15th 2018, in order to test sequences of:

  • Switch-on,
  • Ping,
  • exercise the different modes and changes between them (test the state model in the ORCD),
  • dump with S6 of one of the instrument memories,
  • Switch-off.

The datapack which contains the procedure, sequences and the timeline of the plan is given in RPW IGST page.

Tests have ben run by :

  • S. Lodiot (MOC)
  • D. Bérard (ROC)
  • A. Vecchio (ROC)

Test environnement

IGST 4_2 tests have been run on MEB EM2 with IDB 4.3.3.

Sequences used during the tests were send to MOC weeks before and were available for IGST test.

A slot of two hours were dedicated to RPW tests, during which TC were send manually. Between two TC, TM parameters were checked 

  • No labels