About the preparation and analysis of the RPW ANT calibration rolls campaign, to be performed during the CP.
General
Purpose & Objectives
Calibration rolls are planned during the Cruise Phase (CP) in order to characterized the RPW ANT effective vectors.
Working Group Members
- Xavier Bonnin – RPW Ground Segment Project Manager (LESIA)
- Milan Maksimovic – RPW PI, TNR-HFR Lead-CoI (LESIA)
- Unknown User (eguilhem) – RPW system engineer (CNES)
- Jean-Michel Travert – RPW command/control engineer (CNES)
- Baptiste Cecconi – Goniopolarimetry expert (LESIA)
- Lorenzo Matteini – TNR-HFR CoI, TNR-HFR calibration software manager (LESIA)
- Sylvain Lodiot – SolO Operation Manager (MOC)
The roc.ops mailing list members must be involved in the discussions.
Operation preparation
Overall timeline
Give here the overall timeline of the operation, including the expected instrument operating configurations.
Orbitography
Give here the orbitography (i.e., time versus S/C orbit/attitude)
Operation Constraints
Give here the operation constraints at RPW and SOLO levels (e.g., TM rate, PW, SOOP, etc.)
Command/Control
Give here the list of flight procedures and IOR (PDOR?) required to execute this operation
Data analysis
Expected data products
Give here the list of expected data products
Results
Give here the results of the data analysis (can be attached file, or link to references)