About the preparation and analysis of the RPW ANT calibration rolls campaign, to be performed during the CP.
General
Purpose & Objectives
Calibration rolls are planned during the Cruise Phase (CP) in order to characterized the RPW ANT effective vectors.
Working Group Members
- Xavier Bonnin – ROC manager (LESIA)
- Milan Maksimovic – RPW PI, TNR-HFR Lead-CoI (LESIA)
- Antonio Vecchio – RPW operations scientist (LESIA)
- Diane Berard – RPW operations engineer (LESIA)
- Lorenzo Matteini – TNR-HFR CoI, TNR-HFR calibration software manager (LESIA)
Points of contact
- Sylvain Lodiot – SOLO Operations manager – (MOC)
- Baptiste Cecconi – Goniopolarimetry expert (LESIA)
- Eric Lorfevre – RPW system engineer (CNES)
- Jean-Michel Travert – RPW command/control engineer (CNES)
Operation preparation
Overall timeline
In the Feb. 2020 launch scenario, the ANT call rolls can be planned during the first week of COM or just before the NMP start.
Detailed timeline needs TBD.
Orbitography
Give here the orbitography (i.e., time versus S/C orbit/attitude)
Operation Constraints
Give here the operation constraints at RPW and SOLO levels (e.g., TM rate, PW, SOOP, etc.)
Command/Control
Give here the list of flight procedures and IOR (PDOR?) required to execute this operation
Data analysis
Expected data products
Give here the list of expected data products
Results
Give here the results of the data analysis (can be attached file, or link to references)