You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Next »

About the preparation and analysis of the RPW ANT calibration rolls campaign, to be performed during the CP.


General

Purpose & Objectives

Calibration rolls are planned during the Cruise Phase (CP) in order to characterized the RPW ANT effective vectors.

Working Group Members

Points of contact

  • Sylvain Lodiot – SOLO Operations manager – (MOC)
  • Baptiste Cecconi – Goniopolarimetry expert (LESIA)
  • Eric Lorfevre – RPW system engineer (CNES)
  • Jean-Michel Travert – RPW command/control engineer (CNES)

Operation preparation

Overall timeline

In the Feb. 2020 launch scenario, the ANT call rolls can be planned during the first week of COM or immediately after the EGAM at the beginning of the NMP.

Detailed timeline needs TBD.

Orbitography

Give here the orbitography (i.e., time versus S/C orbit/attitude)

Operation Constraints

Give here the operation constraints at RPW and SOLO levels (e.g., TM rate, PW, SOOP, etc.)

Command/Control

Give here the list of flight procedures and IOR (PDOR?) required to execute this operation

Data analysis

Expected data products

Give here the list of expected data products

Results

Give here the results of the data analysis (can be attached file, or link to references)

Related resources

Meeting Notes

Action Items

Open issues

Attached Files


  • No labels