Information about the Boom deployment operation during the LEOP.


General

Purpose & Objectives

Prepare the Boom deployement RPW-related operations during the LEOP.

Working Group Members

RPW sub-system teams will also contribute to define the RPW modes to be set during the deployement.

Operation preparation

Context & assumptions

RPW will be switched-off during the LEOP, except during the Boom and ANT deployments operations.

During the Boom deployement the MAG instrument will be also switched-on.

The SSMM will be available.

Overall timeline

At SOLO level

The Boom deployment will start at T0=TBD.

The following operations will be performed at the platform level.

TBD

At RPW level

The overall timeline of the Boom deployement is not fully known. Here is a first draft of what it is required from the RPW team.

Especially, a first switching-on of the instrument is required at T0 - 24 hours, in order to perform a SFT (duration ~1h20).

Start TimeDurationRPW stateComment
T0 - 24 hours1h20SFT specific config (TBD)
  • RPW might be switched-off after the SFT
T0 - 10 min9 minRPW switched-off and set to the boom deployment config (TBD)
T0 + 10 min



Orbitography

TBD

Operation Constraints

At SOLO level

TBD

At RPW level

TBD

Command/Control

Give here the list of flight procedures and PDOR (TBC) required to execute this operation

Expected products

Reviews & reports

TBD

Data analysis

Expected data products

Give here the list of expected data products and their content.

Results

Give here the results of the data analysis (can be attached file, or link to references)

Meeting Notes

Actions Items & JIRA Issues

Attached Files

SOL-ESC-ME-10016, i1,r1 [Management of MAG and RPW data gathering during IBoom and RPW-ANT]_signed.pdf – The SSMM will finally available during these operations.