Information about the Boom deployment operation during the LEOP.
General
Purpose & Objectives
Prepare the Boom deployement RPW-related operations during the LEOP.
Working Group Members
RPW sub-system teams will also contribute to define the RPW modes to be set during the deployement.
Operation preparation
Context & assumptions
RPW will be switched-off during the LEOP, except during the Boom and ANT deployments operations.
During the Boom deployement the MAG instrument will be also switched-on.
The SSMM will be available.
Overall timeline
At SOLO level
The Boom deployment will start at T0=TBD.
The following operations will be performed at the platform level.
TBD
At RPW level
The overall timeline of the Boom deployement is not fully known. Here is a first draft of what it is required from the RPW team.
Especially, a first switching-on of the instrument is required at T0 - 24 hours, in order to perform a SFT (duration ~1h20).
Start Time | Duration | RPW state | Comment |
---|---|---|---|
T0 - 24 hours | 1h20 | SFT specific config (TBD) |
|
T0 - 10 min | 9 min | RPW switched-off and set to the boom deployment config (TBD) | |
T0 + 10 min |
Orbitography
TBD
Operation Constraints
At SOLO level
TBD
At RPW level
TBD
Command/Control
Give here the list of flight procedures and PDOR (TBC) required to execute this operation
Expected products
Reviews & reports
TBD
Data analysis
Expected data products
Give here the list of expected data products and their content.
Results
Give here the results of the data analysis (can be attached file, or link to references)
Meeting Notes
Actions Items
Attached Files
SOL-ESC-ME-10016, i1,r1 [Management of MAG and RPW data gathering during IBoom and RPW-ANT]_signed.pdf – The SSMM will finally available during these operations.