About the preparation and analysis of the RPW ANT calibration rolls campaign, to be performed during the CP.
Working Group Members
- Xavier Bonnin – ROC manager (LESIA)
- Milan Maksimovic – RPW PI, TNR-HFR Lead-CoI (LESIA)
- Antonio Vecchio – RPW operations scientist (LESIA)
- Diane Berard – RPW operations engineer (LESIA)
- Unknown User (lmatteini) – TNR-HFR CoI, TNR-HFR calibration software manager (LESIA)
Points of contact
- Sylvain Lodiot – SOLO Operations manager – (MOC)
- Baptiste Cecconi – Goniopolarimetry expert (LESIA)
Mykhaylo Panchenko - AKR/Antenna simulation expert (SRI)
- Eric Lorfevre – RPW system engineer (CNES)
- Jean-Michel Travert – RPW command/control engineer (CNES)
- Moustapha Dekkali - MEB manager (LESIA)
Deliverables
Related resources
Meeting Notes
Action Items