ROC has prepared specific Excel sheets for the in-flight validation activities of RPW. The main idea is to list all the activities and related relevant information in order to prepare these tasks (to ensure nothing has been forgotten)
COMMISSIONING validation activity:
The reaction wheels filtering should be added somewhere (during interference campaign or antenna rolls?)
A 8th RPW activity should be asked to MOC to test the nominal working of RPW before the Cruise Phase (CP). Especially, all modes should be tested and run for enough long time (~24h) and nominal modes with other IS instruments should be run. If possible the SBM_DETECTION should be activated (but quick downlink of selective data is not garantuee for now during the NECP and CP phases)
What about the inter-instrument communication (IIC) validation? Done during NECP or CP? Functional part (checking TM exchanged via S20 should be possible, but it would be difficult for the detection part without event).
Action XB: Verify with MOC/SOC if ICC flight validation campaign is planned and when
Action DB: Prepare and submit to MOC the 8th activity for RPW
Splinter session RPW flight configurations
RPW lead CoI teams + Diane and Antonio
COMMISSIONING
——————————————
During commissioning HK at least every second (or even higher cadence if possible)
iBoom deployement : In order to synchronize snapshots between LFR and TDS, TDS will increase the time between two snapshots to 11s (instead of 10s)
Antenna + I-Boom + interference campaign : all sub systems in SBM1+normal mode. Same configuration for LFR and TDS for each campaign.
LFR : temps entre 2 snapshots 22s
TDS : 1 snapshot chaque seconde + 1 triggered toutes les 11s —> un snapshot every 11s, one simultaneously with LFR, one without LFR
SCM agrees with LFR config
LFR wants to add during interference campaign a configuration to test the reaction wheels effect.
The LFR document for interference campaign has been transfered to the Bias team for filling its own doc.
LOW RATE
——————————————
The daily 10 min. of SURVEY_BURST mode do not take too much telemetry rate (<5%) so we can let it. But the SBM1 mode has significant telemetry rate.
For LFR, the main goal is to have the higher cadence as possible for the BP.
TDS has no specific constraint
2 configs for low rate :
1)
LFR :
no SBM,
10 min of SURVEY_BURST,
time between two snapshots 1800s;
time between two ASM : 3600s,
time between BP : 8s;
time between 2 products : 40s
TDS :
Time between 2 RSWF : 1800s;
Time between 2 TSWF : 7200s
—> cf calculator LOW RATE 1 (TODO : Put the ref)
2)
LFR :
SBM1 activated
10 min of SURVEY_BURST,
time between two snapshots 3600s;
time between two ASM : 3600s,
time between BP : 16s;
time between 2 products : 60s
—> cf calculator LOW RATE 2 (TODO : Put the ref)
UpdateCalculator
————————————————————— LFR calibration : snapshots every 22 s (change in LFR software in progress).This will have a slight impact on the data rate because currently the same configuration is kept in NORMAL-DEFAULT: 1 snapshot every 300s
Action Jan : correct word file with 11s.
All team will provide word files about antenna, I-Boom and Interference campaign before the end of next week
Action AV : Put on Git the two calculator sheets for the low-rate config.
Action DB : Send the calculator sheets with the two low rate config to LFR and SCM (TDS already has them).
Action AV : Put on Confluence the page with all the nominal configs (as well as the fixed parameters) and send the url to the teams.