You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 17 Next »

Status of delivery and outstanding engineering issues for the RCS.


RCS-related product delivery status

ProductTDSLFRTHRSCMBias
ROC-SGSE L1R skeletonsDeliveredDeliveredDo we need L1R for THR?

ROC-SGSE L1R CDFV2 To be producedV2 To be produced


ROC-SGSE L2S skeletonsNeed updates (cal. metadata)Need updates (cal. metadata)Need updates (cal. metadata)Need updates (cal. metadata)Need updates (cal. metadata)
ROC-SGSE L2S CDFV2 To be producedV2 To be producedV2 To be produced
V2 To be produced
V2To be produced
ROC-SGSE CAL table skeletonsDelivered for LFM and SURV-SWFV1 deliveredTo be deliveredV1 deliveredV01 delivered
ROC-SGSE CAL table CDFTo be deliveredV1 deliveredTo be deliveredV1 deliveredTo be delivered
RODP L1R skeletonsTo be deliveredTo be deliveredDo we need L1R for THR?

RODP L1R CDFTo be deliveredTo be delivered


RODP L2 skeletonsNeed updates (cal. metadata, ANC data and attributes for mission)Need updates (cal. metadata, ANC data and attributes for mission)Need updates (cal. metadata, ANC data and attributes for mission)Need updates (cal. metadata, ANC data and attributes for mission)Need updates (cal. metadata, ANC data and attributes for mission)
RODP L2 CDFTo be producedTo be producedTo be producedTo be producedTo be produced
RODP CAL table skeletonsTo be deliveredTo be deliveredTo be deliveredTo be deliveredTo be delivered
RODP CAL table CDFTo be producedTo be producedTo be producedTo be producedTo be produced

RCS software delivery status

Software versionDue dateTDSLFRTHRSCMBias
RCS preliminary S/W (preliminary ROC-SGSE data processing for ground calibration campaigns)

 






RCS "processing" S/W (preliminary L1R/L2S data production)

 

0.8 pushed on Gitlab

0.3 pushed on Git (master branch)

1.1.0 pushed on Gitlab (develop branch)

0.6 pushed on Gitlab (master branch)0.1.0 pushed on Gitlab (master branch)
RCS "ready-for-flight" S/W (full L1R/L2 data production + ICD compliant)

 






RCS "fully operational" S/W (updgrades after commissioning)

  






RCS software testing status ("ready-for-flight" version only)

TestTDSLFRTHRSCMBias
RCS ICD compliance




RCS E2E data package





RCS documentation delivery status

DocumentTDSLFRTHRSCMBias
SRS1.0 delivered1.0 delivered

1.1 delivered.

1.0 delivered
SUM1.0 delivered1.2 delivered

1.0 delivered.

Draft version delivered
DPDD




Color cell legend





OKIncompleteNot OKN/A

Action-Items

TO BE DONE TASKS

TDS

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

LFR

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

SCM

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

BIAS

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

THR

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

ROC

TO BE ADDED TO JIRA

  • Update the ROC-SGSE documentation to remove the reference to L2R and replace it by the L1R – Xavier Bonnin– 

  • Produce ROC-SGSE V3 L1/HK for all campaigns (EM2 BLANK TESTS, PFM CAL and DELTACAL) – Xavier Bonnin–  – postponed due RODP/ROC-SGSE plugin merging

  • Provide the list of L1/HK quicklook data products for the SOLO mission -- ROC –  – To be provided into the "RPW data products" doc.
  • Update the RCS ICD validation tool on roc-dev –  –  Quynh Nhu NGUYEN
  • After received example of cal. tables, ROC will make proposal of conventions for the CAL table. It will be written in the "RPW Data Products" – Xavier Bonnin – ASA examples have been received
  • Plan a discussion about L3 data exchange – Xavier Bonnin –

RCS-RELATED JIRA ISSUES SUMMARY LIST

"Backlog" issues

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

"To Do" issues

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

"In Progress" issues

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

Closed issues

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

Acronyms

See Acronyms and Definitions

  • No labels