Summary
Preparation of the SVT1 datapackage release for RPW.
The SVT1 campaign is expected to occur between Feb. to May 2019 (TBC).
Main features of the SVT1 datapackage
- Upgraded RPW flight procedures from IGST42 datapackage
- New RPW flight procedures related to the instrument commissioning and cruise phase operations.
- Upgraded version of the RPW ISM
- First issue 1.0 of the RPW flight configuration description document (FCDD)
Planning
- A first set of RPW flight procedures for SVT1 is planned to be delivered by email to Sylvain Lodiot (MOC) on mid-October 2018.
- The full SVT1 data package will have to be delivered before .
Action-items related to the SVT1 datapackage
- Link to the ROC_SVT1_DATAPACK Kanban board in JIRA: https://jira-lesia.obspm.fr/secure/RapidBoard.jspa?rapidView=79