This page gives information about the RPW Flight Procedures (RFP).
According to the FOP, the flight procedures are divided into three categories: the Flight Control Procedures (FCP), the Contingency Recovery Procedures (CRP) and the Commissioning Procedures (COM). For each of these categories, a table listing: the Name, Purpose, Author(s), Creation date, current status (possible values are "To be done", "In progress", "Done", "Validated", "Added to FOP") and any additional comments is given below. Note that the procedure file naming and format must comply the convention in SOL-ESC-IF-10002. It means that the file must be a Excel format file (.xls) with the procedure name as a file name.
Flight Control Procedures (FCP)
The table below gives the list of generic procedures, other than specific to the contingency recovery or commissioning operations (see next sections).
Name | Description | Configuration at start | Configuration at end | Author(s) | Creation date | Status | Comments |
---|---|---|---|---|---|---|---|
IW-FCP-001 | RPW switch ON in SAFE mode using the prime/A interface for LCL and SpaceWire | RPW OFF | RPW ON and in SAFE mode with prime/A SpaceWire active | Done | RP-FCP-001_Iss01Rev00 to be renamed in IW-FCP-001 | ||
IW-FCP-002 | RPW switch ON in SAFE mode using the prime/B interface for LCL and SpaceWire | RPW OFF | RPW ON and in SAFE mode with prime/B SpaceWire active | Done | RP-FCP-002_Iss01Rev00 to be renamed in IW-FCP-002 | ||
IW-FCP-003 | Start DAS from EEPROM1 and transition to SERVICE mode | RPW in SAFE mode | RPW in SERVICE mode | Done | RP-FCP-003_Iss01Rev00 to be renamed in IW-FCP-003 | ||
IW-FCP-004 | Start DAS from EEPROM2 and transition to SERVICE mode | RPW in SAFE mode | RPW in SERVICE mode | Done | |||
IW-FCP-005 | Start DAS from RAM and transition to SERVICE mode | RPW in SAFE mode | RPW in SERVICE mode | Done | |||
IW-FCP-006 | Switch ON BIAS; BOOT LFR;BOOT THR; BOOT TDS | RPW in SERVICE mode | RPW in SERVICE mode; LFR, THR, TDS ON | Done | |||
Contingency Recovery Procedures (CRP)
The table below gives the list of procedures specific to the contingency recovery operations.
Name | Description | Configuration at start | Configuration at end | Author(s) | Creation date | Status | Comments |
---|---|---|---|---|---|---|---|
Commissioning Procedures (COM)
The table below gives the list of procedures specific to the commissionning operations, including ANT and iBoom deployments, as well as the interference campaign.
Name | Description | Configuration at start | Configuration at end | Author(s) | Creation date | Status | Comments |
---|---|---|---|---|---|---|---|