This page gives information about the RPW Flight Procedures (RFP)


About the RPW Flight Procedures

According to the FOP, the flight procedures are divided into three categories: the Flight Control Procedures (FCP), the Contingency Recovery Procedures (CRP) and the Commissioning Procedures (COM).

The RPW procedures files are archived in the /Procedures folder of the https://gitlab.obspm.fr/ROC/OpsLib gitlab repository (restricted access). A test version of this repository is available in https://gitlab.obspm.fr/ROC/OpsLib-Test (restricted access).

For a list of the corresponding RPW Operating Configurations (RPWCons), see RPW Operating Configurations.

For each of these categories, a table lists the following information:

  • Name of the procedure
  • Description
  • Configuration at start
  • Configuration at end
  • Author(s)
  • Creation date
  • Current status (possible values are "To be done", "In progress", "Done", "Validated", "Added to FOP")
  • Any additional comments is given below. Note that the procedure file naming and format must comply the convention in SOL-ESC-IF-10002. It means that the file must be a Excel format file (.xls) with the procedure name as a file name.

Editing a procedure

The SOC provides to the instrument teams an online "Procedure Builder" than can be used to create/edit procedures. The site dedicated to RPW is available here. Nevertheless, the SOC cannot guarantee that this tool will be maintained during the whole mission, and the instrument teams are invited to develop and maintain their own tool. In the case of the ROC, the FIGARO tool, accessible via the MUSIC Web portal will replace at medium term the SOC procedure builder.


IMPORTANT

Please visit the operation guidelines page before editing a procedure!

Flight Control Procedures (FCP)

The table below gives the list of generic procedures, other than specific to the contingency recovery or commissioning operations (see next sections).

NameDescriptionConfiguration at startConfiguration at endAuthor(s)Creation dateStatusComments

IW-FCP-001


RPW switch ON in SAFE mode using the prime/A interface for LCL and SpaceWireRPW_OFFRPW_SAFE

Unknown User (deconchy), Bernard Pontet


DoneRP-FCP-001_Iss01Rev00 to be renamed in IW-FCP-001
IW-FCP-002RPW switch ON in SAFE mode using the prime/B interface for LCL and SpaceWireRPW_OFFRPW_SAFE

Unknown User (deconchy), Bernard Pontet


DoneRP-FCP-002_Iss01Rev00 to be renamed in IW-FCP-002
IW-FCP-003Start DAS from EEPROM1 and transition to SERVICE modeRPW_SAFERPW_SERVICE

Unknown User (deconchy), Bernard Pontet


DoneRP-FCP-003_Iss01Rev00 to be renamed in IW-FCP-003
IW-FCP-004Start DAS from EEPROM2 and transition to SERVICE modeRPW_SAFERPW_SERVICE

Unknown User (deconchy), Bernard Pontet


DoneRP-FCP-004_Iss01Rev00 to be renamed in IW-FCP-004
IW-FCP-005Start DAS from RAM and transition to SERVICE modeRPW_SAFERPW_SERVICE

Unknown User (deconchy), Bernard Pontet


DoneRP-FCP-005_Iss01Rev00 to be renamed in IW-FCP-005
IW-FCP-006 BOOT LFR from EEPROM1RPW_SERVICERPW_SERVICE

Unknown User (deconchy), Bernard Pontet


DoneRP-FCP-006_Iss01Rev00 to be renamed in IW-FCP-006
IW-FCP-007BOOT THR from EEPROM1RPW_SERVICERPW_SERVICE
Done
IW-FCP-008 BOOT TDS from EEPROM1RPW_SERVICERPW_SERVICE
Done
IW-FCP-009BOOT LFR from EEPROM2RPW_SERVICERPW_SERVICE
Done
IW-FCP-010BOOT THR from EEPROM2RPW_SERVICERPW_SERVICE
Done
IW-FCP-011BOOT TDS from EEPROM2RPW_SERVICERPW_SERVICE
Done
IW-FCP-012BOOT LFR from RAMRPW_SERVICERPW_SERVICE
Done
IW-FCP-013BOOT TDS from RAMRPW_SERVICERPW_SERVICE
Done
IW-FCP-014BOOT THR from RAMRPW_SERVICERPW_SERVICE
Done

IW-FCP-015

Switch ON BIASRPW_SERVICERPW_SERVICE
Done
IW-FCP-016Configure TDS, LFR and THR for the RPW_SCIENCE-NORMAL_DEFAULT config.RPW_SERVICERPW_SERVICE
InProgressIW-FCP-001 to be renamed to IW-FCP-009
IW-FCP-017Configure the Bias for the RPW_SCIENCE-NORMAL_DEFAULT config.RPW_SERVICERPW_SERVICE
InProgressIW-FCP-002 to be renamed to IW-FCP-009
IW-FCP-018Enter in RPW_SCIENCE-NORMAL_DEFAULTRPW_SERVICERPW_SERVICE_SCIENCE-READY
DoneIW-FCP-003 to be renamed to IW-FCP-009
IW-FCP-019Configure and execute the BIAS sweepRPW_SCIENCE-NORMAL_DEFAULTRPW_SCIENCE-NORMAL_DEFAULT
In progress
IW-FCP-020 Internal Calibration for THRRPW_SCIENCE-NORMAL_DEFAULTRPW_SCIENCE-NORMAL_DEFAULT
In progress
IW-FCP-021 Internal Calibration for LFRRPW_SCIENCE-NORMAL_DEFAULTRPW_SCIENCE-NORMAL_DEFAULT
In progress

Contingency Recovery Procedures (CRP)

The table below gives the list of procedures specific to the contingency recovery operations.

NameDescriptionConfiguration at startConfiguration at endAuthor(s)Creation dateStatusComments








Commissioning Procedures (COM)

The table below gives the list of procedures specific to the commissionning operations, including ANT and iBoom deployments, as well as the interference campaign.

NameDescriptionConfiguration at startConfiguration at endAuthor(s)Creation dateStatusComments