Information about the RPW antennas deployments operation during the LEOP.
Purpose & Objectives
TBW
Working Group Members
TBW
Operation preparation
Overall timeline
Give here the overall timeline of the operation.
Orbitography
Give here the orbitography (i.e., time versus S/C orbit/attitude)
Operation Constraints
Give here the operation constraints at RPW and SOLO levels (e.g., TM rate, PW, etc.)
Command/Control
Give here the list of flight procedures and IOR (PDOR?) required to execute this operation
Data analysis
Expected data products
Give here the list of expected data products
Results
Give here the results of the data analysis (can be attached file, or link to references)