You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

RPW related operations during the NECP.


List of operations

Auto-compatibility of inter-instrument interference campaign

Purpose & Objectives

TBW

Working Group Members

TBW

Operation preparation

Overall timeline

Give here the overall timeline of the operation.

Orbitography

Give here the orbitography (i.e., time versus S/C orbit/attitude)

Operation Constraints

Give here the operation constraints at RPW and SOLO levels (e.g., TM rate, PW, etc.)

Command/Control

Give here the list of flight procedures and IOR (PDOR?) required to execute this operation

Data analysis

Expected data products

Give here the list of expected data products

Results

Give here the results of the data analysis (can be attached file, or link to references)

Meeting Notes

RPW - PAS filtering tune campaign

TBW

TDS - LFR internal algorithms validation campaign

Description



  • No labels