Goals

  • ROC RCS telecon

Date

at 2pm

Attendees


  • Xavier Bonnin

  • Jean-Yves Brochot (apologized)
  • Thomas Chust
  • Erik Johansson
  • Bruno Katra
  • Matthieu Kretzchmar (apologized)
  • Rodrigue Piberne
  • Quynh Nhu Nguyen
  • David Pisa

  • Jan Soucek (apologized)
  • Antonio Vecchio

Agenda

  1. RPW data processing - Status overview
  2. On-going & future developments
  3. Documentation
  4. Planning
  5. Next RCS telecon
  6. AOB

Discussion items

ItemNotesAction-items
1.
  • L0/L1/HK data production
    • RODP Pipeline V1.12 release in preparation. Will be used for re-processing
  • L2 data production
    20210114_RCS_Status_Telecon26.pdf
  • Data sharing
  • Data release

2.
  • SKELETON_MODS / MODS change in CDF skeletons & Data release traceability
    • CDF skeletons are ready to be updated
    • Do wait for Data release traceability implemented before running the re-processing ?
  • CDF compliance versus SPDF-ISTP standards:
    • Difficult for some skeletons (mainly fix inconsistencies)
    • Done for L1, almost done for L2
    • To be pushed into Gitlabl
  • L3 data workflow at LESIA
    • Interface RCS → LESIA has been tested with Bias and THR teams
    • Erik wonders if there is a possibility to run the L3 CDF production at LESIA (as for L2) ? (Bias L3 CDF are generated using BICAS with RCS ICD interface). Xavier answers that ROC is open to discussion and it could be envisaged, but not at in short term.
    • Next steps:
      • For BIAS and THR teams to provide L3 CDF to LESIA in regular basis
      • For ROC to test and run the L3 CDF delivery to ESAC
      • Deliver progressively other L3 products
  • Science quality
  • Summary plots
  • Adding HK CDF dataset for:
    • LFR KCOEFF and Parameters dump (still to be done)
    • SBM1 HK (TBC)
  • Xavier to modify CDF skeleton on "spdf_compliance" branch for ISTP compliance (except for TDS_CALBA)
  • David to modify TDS_CALBA CDF skeleton on "spdf_compliance" branch for ISTP compliance
  • Xavier to contact each team individually to take stock of the summary plots production at LESIA
  • Xavier to provide to LFR team piece of information about how HK CDF are generated in the ROC pipeline
  • LFR teams to provide skeletons for LFR Kcoeff dump
  • Xavier to upgrade RCS ICD with information about summary plots and L3 data workflow
  • Xavier to check with Sonny about IDL codes sent by SCM team to plot their data
3.
  • DPDD to be updated when new CDF skeletons will be released
  • RCS ICD to be updated (e.g., SKELETON_MODS/MODS)
  • ROC V5.1 (RSS5.1) datapack released (delivered to CNES)
    • Two documents to fix: ROC-PRO-PIP-SPC-00036-LES and ROC-PRO-SFT-SUM-00501-IAP

4.None
5.Next RCS telecon is scheduled on March 17 at 2PM (CET)
6.None

Action items

Open issues

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

Closed issues

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

Attached items