Review of action-items and open issues (by each team: TDS, LFR, THR, ROC, DAS)
Planning
Next meeting
AOB
Discussion items
Item
Notes
Action-Items
1.
LFR
ASM bug has been solved, but S/W crashes (new computation in S/W seems to be too heavy for CPU load. Work is still in progress
QAP support:
Required support needs to be refine with help of the CNES, as well as budget
May be approx. 5-6 days of NEXEYA support
Joined effort with LESIA is probably not needed, since the degrees of quality support should be not the same (less for LESIA)
TDS
A new version of the TDS software will delivered
TDS should be OK to deliver a FSW image before mid-July 2021
Upgrades seem to be OK (need verifications)
Not important changes, increases by few bytes the software size
LeeRoy thinks it will be OK to deliver corresponding C-SGSE scripts to ROC by the end of August.
THR
FSW upgrades
Science algorithm of new THR FSW has been tested by Pierre-Luc
FSW tests
C-SGSE scripts RPWDPU-1984_Load_EEPROM1_RpwThrApp_V3_6_1_0 and RPWDPU-1984_Load_EEPROM2_RpwThrApp_V3_6_1_0 available on RPW-AIT2AI
Scripts to be run by ROC
Kamel will be at LESIA from July 5 to 9 to test and finalize the THR patch. It can be good that both ROC and DAS teams are available if required.
ROC will try to see with Simone Thjis if it is possible to test the execution of the C-SGSE scripts before the Kamel's arrival (TBC)
New TNR tests on EM2 perfomed by ROC at LESIA. Data sent to Antonio
QAP support
Light support needed for LESIA.
THR team will see with CNES about quantifying support from NEXEYA and the impact on the FSW upgrade on documentation.
Planned a discussion about documentation between THR team and Charles Dixon, if possible, during the week when Kamel is at Meudon.
Documentation:
Kamel might write the documentation
What about THR test plan ? See with ESA (if all tests in plan are not run, it shall be justified)
If everything is OK, new THR FSW image might be delivered before mid-July
ROC
Will support THR team for the tests run when Kamel will be here
Still need to write formal plan in preparation to in-flight patching operation
MOC/SOC will have to be informed if current planning is changed
Main activities are still planned on Sept/October (retrieve C-SGSE scripts, test on EM2 and convert into MDOR/PDOR)
THR team to think about who will update the documentation related to FSW patching
ROC (Xavier/Diane) to write a "RPW FSW patching report" detailling the tests results - To be joined with teams' documents to the datapack delivered to ESA
Xavier to see if joint effort is possible about QAP support for LPP and LESIA
LeeRoy: To check availability during July 5 to 9 (in case of C-SGSE script re-delivery)
ROC to run with the help of Simone the THR C-SGSE scripts on EM2
2.
TDS/THR FSW images delivered on mid-July 2021 to DAS team
DAS team to deliver to ROC C-SGSE scripts (deadline mid-september 2021)
LFR team to refine the date of delivery for its patch in 2022 - End of 2021
3.
Next meeting planned on September 14 at 10AM (CEST)