Goals

  • Status on RCS integration
  • EMC data

Date

at 2pm

Attendees


  • Xavier Bonnin

  • Jean-Yves Brochot
  • Thomas Chust
  • Erik Johansson
  • Yuri Khotyaintsev
  • Matthieu Kretzchmar
  • Milan Maksimovic
  • Lorenzo Matteini
  • Rodrigue Piberne
  • Quynh Nhu Nguyen
  • David Pisa

  • Jan Soucek

Agenda

1. RCS integration status
2. EMC preliminary data
3. ROC pipelines and data product status 
4. RCS software and data product status
5. Planning
6. Next RCS telecon
7. AOB



Discussion items

ItemNotesAction-items
1.
  • RCS integration
    • Integration of THR_CALBAR is done (minor corrections to do and test data verification to be implemented)
    • Integration of LFR_CALBUT is in progress
    • Integration of TDS_CALBA is in progress
    • Integration of SCMCAL has started
    • Integration of BICAS is postponed (not before mid-July)
  • RCS test data
    • TBW
  • Xavier will write a short document describing the RCS verification/validation test activities – Still to be done
  • Information about the RCS verification/validation test activities is summarized on RCS testing/validation activity

2.
  • Preliminary RPW L0/L1/HK data files for SolO EMC campaign (21-23/05/2019) have been produced by the ROC from ADS inputs provided by the CNES
  • Data files are available here: https://rpw.lesia.obspm.fr/roc/data/private/devtest/rpw/emc/roc-sgse/ (restricted access)
  • Data for May 21 are missing. The CNES team is waiting from input of ADS
  • Eric will provide more details about EMC during the ROB telecon on at 10am
  • Data files have been generated using the mission filenaming convention (except free_field part) and with CDF skeleton V04 (only available for the moment in the "roc" branch of the DataPool repository : https://gitlab.obspm.fr/ROC/DataPool/tree/roc)

3.
  • RODP pipeline
    • Working with MOC DDS XML files is up-and-running
    • First version of the DDS Python client has been delivered by the SPICE team at IAS, implementation in the ROC pipeline should be started within few weeks
    • Export in MEB GSE test log XML files is in progress
    • Export in ADS GSE ASCII files (usable by the CNES PRESTO tool) is done
    • New L1 LFR BP1/BP2 computation has been done, but need to be validated
    • Ancillary data processing is still to be done
  • ROC-SGSE pipeline
    • Instance is up-and-running (include processing of ADS GSE ASCII files used for EMC campaign)
  • RPW data products
    • RODP L1/HK/L1R/L2 skeleton CDF have been updated to be compliant with ESA standards (doc. still need to be updated). The resulting files are for the moment stored in the "roc" branch of the DataPool repository
    • ROC-SGSE L1/HK/L1R/L2 skeleton CDF have been merged with the mission skeletons (RODP). The resulting files are for the moment stored in the "roc" branch of the DataPool repository
    • All RPW skeleton CDF will be stored in a single SOLO/RPW/CDF directory in the DataPool repository
    • Teams will have to "push" skeleton table in ASCII format (.skt), instead of Excel format (.xlsx). Nevertheless the skeletoncdf tool in "maser4py" python package is maintained if teams want to work with Excel skeletons.
  • Documentation
    • RCS ICD 1.2 - Up-to-date in ROC Documents
    • REGU 2.1 - Skeleton delivery procedure to be updated
    • RDP 1.2 - Description of the "RCT validity range" XML file to be added
    • BOICD 1.0 - Updated according to Kiruna discussions, will be sent to BIAS team within few days
    • LFR Operation ICD 1.0 - in progress

4.
  • RCS Delivery Status & Action-Items
  • THR_CALBAR
    • Include ANT calibration (V^2/Hz—>W/M^2/Hz) to be done (for now, spectral power at PA+REC level)
    • Vratislav feedback? —> take also the auto/cross AGC in V^2/Hz @ receiver + phase
    • Magnetic part? —> Calibration in progress with SCM team.  RCT to be done
    • PA HF TF CDF for TDS? —> Ready to be delivered
  • TDS_CALBAR
    • Not used PA HF CDF yet (still IDL)
    • Last pushed version is 0.8.3
  • LFR_CALBUT
    • Send Test id to SCM for calibration comparison
  • SCMCAL
    • Not much since last telecon. Next step will be the availability of L1R data samples and integration into the pipeline
  • BICAS
    • Not much since last telecon. Next step will be the availability of L1R data samples and integration into the pipeline

5.
  • RCS integration is on-going
  • ROC V4 validation campaign (RSS4VC) should be postponed to October 2019 (TBC)

6.
  • Next RCS telecon

7.

Action items

Open issues

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

Closed issues

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

Attached items