Goals

  • ROC RCS telecon

Date

at 2pm

Attendees


  • Xavier Bonnin

  • Jean-Yves Brochot
  • Thomas Chust
  • Erik Johansson
  • Bruno Katra
  • Matthieu Kretzchmar
  • Rodrigue Piberne
  • Quynh Nhu Nguyen
  • David Pisa

  • Jan Soucek
  • Antonio Vecchio

Agenda

  1. RPW data processing - Status overview
  2. On-going & future developments
  3. Documentation
  4. Planning
  5. Next RCS telecon
  6. AOB

Discussion items

ItemNotesAction-items
1.
  • L0/L1/HK data production
    • Nominal in overall (triggered every day at 4am)
    • SBM L1 CDF production not started yet (still bug with LFR BP1/BP2 to be fixed)
    • Works in progress to fix minor bugs, update continuous integration (unit test coverage) and improve processing time performance (should be transparent to RCS and data users)
  • L2 data production
    • RCS_Status_20201105.pdf
    • About master CDF handling:
      • Usual way is to always inform RCS teams as soon as changes will be / have been brought to the L1 CDF skeletons. To let the teams the time to check that these changes do not impact the L1R/L2 CDF production
      • ROC might think about a more fluent way
  • Data release
  • Issue tracking: do not forget to use Gitlab to report any issue with RPW data processing

2.
  • CDF compliance versus SPDF-ISTP standards:
    • CDF_Check_SolarOrbiter_RPW_Science.txt
    • For TNR L2 CDF: CDF_check_solo_l2_rpw-tnr-surv.txt
    • Check performed with SKTeditor: https://spdf.gsfc.nasa.gov/skteditor/ (installation in progress on roc2-dev server)
    • ROC will fix L1 CDF skeletons to be as much as possible compliant with SPDF standards
    • What about L2 (ROC with support from teams?) → Done by Xavier with support of teams, except for TDS_CALBA (already started by David)
    • Dedicated branch "spdf_compliance" will be used to updated skeletons
    • New versions of skeletons will be released with changes
  • L3 data workflow at LESIA
    • Workflow: RCS → LESIA → ESAC
    • LESIA SFTP server shall be used (same than for summary plots, but L3 files will be dropped in l3/ folder)
    • L3 delivered to SOAR with latency? (After reception at LESIA)
    • ROC can support teams to check L3 CDF skeletons
    • As soon as a team feels ready to generate L3 product, please contact me, to define a roadmap
  • Science quality
    • QUALITY_BITMASK - implementation (still) in progress in L1
    • QUALITY_FACTOR setting
  • Summary plots
    • Only Bias, LFR and some TNR-HFR products available
    • TNR-HFR summary plot production implemented at LESIA (LFR in progress)
    • SCM has sent IDL code to plot data. Action Xavier: Sonny to check and send feedback
  • Adding HK CDF dataset for:
    • LFR KCOEFF dump
    • SBM1 HK
  • Xavier to modify CDF skeleton on "spdf_compliance" branch for ISTP compliance (except for TDS_CALBA)
  • David to modify TDS_CALBA CDF skeleton on "spdf_compliance" branch for ISTP compliance
  • Xavier to contact each team individually to take stock of the summary plots production at LESIA
  • Xavier to provide to LFR team piece of information about how HK CDF are generated in the ROC pipeline
  • LFR teams to provide skeletons for LFR Kcoeff dump
  • Xavier to upgrade RCS ICD with information about summary plots and L3 data workflow
  • Xavier to check with Sonny about IDL codes sent by SCM team to plot their data
3.
4.

5.

6.

Action items

Open issues

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

Closed issues

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

Attached items